F0002-AA007595-AAR-09-SMP · MCU14/0102.05
Attached to the e-mail Updated SW management plan MCU14/0102.05.
The Freedom Fuels site is being monitored in accordance with an agreed protocol formulated with Griffith
University, and will continue until 15 qualifying events have been analysed. The present data will need to be
supplemented before it can be considered to comply with the Healthy Waterways Water by Design guidelines.
3.0 Maintenance Procedures
The Maintenance Programme will be kept on the premises at all times, with a ledger recoding all maintenance
and inspection activities. This will provide a useful and efficient record for Inspection officers to facilitate random
verification. Maintenance is performed at a minimum of every six months or if the probe alarm is activated, by
eduction method (suction). The Inspection and Maintenance guideline in Appendix 5 better elaborates the
procedures.
Figure 15. Maintenance Schematic.
3.1 Coalescer Unit
Use the lifting handle or the chain and lift the Coalescer unit out of the tank and place it near the Puraceptor™,
in a retained area so pollutants do not escape.
3.2 Coalescer Foam
Remove the coalescer foam insert, and wash with normal water pressure ensuring the dirty water runs into the
SPEL Puraceptor™.
HEAD OFFICE POSTAL EMAIL ABN spel.com.au
100 Silverwater Road PO BOX 7138 [email protected] 83 151 832 629
Silverwater NSW 2128 Silverwater NSW 2128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
F0002-AA007595-AAR-09-SMP.PDFRelated documentApplication case desk ↗
About this file
- File size
- 9.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.