Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Response to Information Request 10-6-2025 Traffic management plan · OPW25/0042

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Traffic Management Plan – 25040286

       An estimated end-of-queue position is to be determined for the approach to each traffic control station
       and is to be based on the maximum expected traffic flow on that approach during the time traffic control
       will be in operation.
       The count or estimate of the number of average and heavy vehicles during a five-minute period at a
       site may be completed using the following in order of preference:

               1. Actual five-minute count of vehicles during the peak time the site will be occupied. This five-minute
               count is based on the vehicles approaching the selected traffic control station from the approach to be
               controlled by that station (not a sum of both directions of traffic). Consideration of peak traffic flow
               direction may be needed.

               2. If a five-minute count is not possible, use annual average daily traffic (AADT) values with hourly
               breakdowns and percentage heavy vehicle data. To estimate the five-minute count, select the peak
               hourly period during the time the site will be occupied and divide by 12 to get an estimated five-minute
               value. Divide this by two if the AADT is for a two-way road. Use the percentage heavy vehicles
               information with this value to estimate the number of heavy vehicles for this five-minute period.

               3. If a five-minute count is not possible, and AADT values with hourly breakdowns are not available, use
               AADT values and percentage heavy vehicle data. To estimate the five-minute count, firstly divide the
               AADT by a factor of 10 (to get an estimated hourly count) and then divide this by 12 to get an estimated
               five-minute value. Divide this by two if the AADT is for a two-way road. Use the percentage heavy
               vehicles information with this value to estimate the number of heavy vehicles for this five-minute period.
               AADT information for state-controlled roads can be located on the Queensland Open Data Portal – Traffic
               Census data.


       A marker (for example, a cone or bollard) should be placed on the shoulder at the predicted end-of-
       queue to assist the traffic controller and traffic management implementer to monitor queue lengths.

       When estimating the queue length, Table 4.3 uses an average vehicle length of 6 m and an average
       heavy vehicle length of 20 m for a five-minute stopping time (based on the five-minute traffic count) and
       then adjusts the multipliers for other stopping time values.
       Where very long vehicles are expected (for example outback and mining routes or routes where most
       vehicles are towing), then to ensure estimated queue lengths are as accurate as possible, use an
       average length per vehicle that matches the actual traffic mix expected at that location.

   5.1.7   End of queue protection

No Additional End of queue protection required due to low speed road.


   5.1.8   Use of hazard lights by last vehicle in queue

The use of hazard lights by the last vehicle is not required with this project.

   5.1.9   Use of enhanced queued traffic warning signs (TM1-46-Q01)

The use if enhanced queued traffic warning signs is not required for this project.

   5.1.10 Temporary Traffic Signals

Temporary traffic signals are not required with this project.

   5.2 Speed Management Plan

A speed management plan is not required with this project.




                Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 26
                                       [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic management plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.