Skip to the record
Beware of cheap imitations.

Council archive · source document

Response to Information Request 10-6-2025 Traffic management plan · OPW25/0042

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Traffic Management Plan – 25040286

    5.2.1   Speed Choices

Permanent speed limit on the site is 100km/h the aim of this TMP is to reduce the speed limit to 40km/h during
the construction period for the safety of vehicles due to change road surface and the alignment changes of the
road.

    5.3 Road Users

    5.3.1   Pedestrians

Pedestrians will not be affected by this project..

    5.3.2   Cyclists

    No Cycle path identified on site

    5.3.3   Public Transport

Public transport will not be affected by this project.

    5.3.4   Heavy and Oversized Vehicles

Over dimension loads are not expected to pass through these work sites requiring special attention and
assistance to pass safely.

    5.3.5   Existing Parking Facilities

Existing Parking facilities will not be affected by this project.

    5.3.6   Access to Adjoining Properties / Business

Access to adjoining Properties will not be affected by this project.

    5.3.7   Rail Crossings

Rail crossings will not be affected by this project.

    5.3.8   School Crossings

School crossings will not be affected by this project.

    5.3.9   Special Events and Other Works

No special events or other works will not be affected by this project.

    5.3.10 Emergency Vehicle Access

No Delay to emergency services travelling through the site and Delay to emergency services attending
emergencies on site.

    5.4 Night Work Provisions

No night works are planned with this project.




                Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 27
                                       [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic management plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.