Skip to the record
Search everything, all in one place.

Council archive · source document

Response to Information Request 10-6-2025 Traffic management plan · OPW25/0042

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Traffic Management Plan – 25040286

    7.3 PPE

All personnel entering the work site shall correctly wear high visibility clothing to AS/NZS 4602, in addition to
other protective equipment required on a site-by-site basis (e.g. protective footwear, eye protection, helmet,
sun protection, respiratory devices etc.) at all times whilst on the worksite.

 Required PPE


 Biomotion long sleeve shirt and      Broad brimmed hat (EVENTS               Gloves               Safety glasses          Safety boots
 pants                                ONLY) or hard hat with brim                                  night/day




    7.4 Plant and Equipment

All plant and equipment at the workplace shall meet statutory requirements and have the required registration,
licences or certification where required. All mobile equipment shall be fitted with suitable reversing alarms. All
mobile plant and vehicles shall be fitted with a pair of rotating flashing yellow lamps in accordance with
AS1742.3 clause 4.14.1. All workers will be made aware of the safe work practice at the time of the site
induction.

    7.5 Trip Hazards

The worksite and its immediate surroundings shall be suitably protected and free of hazards, which could
result in tripping by cyclists or pedestrians. Hazards, which cannot be removed, shall be suitably protected to
prevent injury to road users, including those with sight impairment. Where level differences are significant,
suitable barriers, which preclude pedestrian access shall be used.

Where works extend beyond daylight hours and adjacent lighting is insufficient to illuminate hazards to cyclists
or pedestrians, appropriate temporary lighting shall be installed.

The worksite shall be kept tidy to reduce the risk to workers.




                  Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 32
                                         [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic management plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.