ORDINARY MEETING AGENDA                                                      17 AUGUST 2017


    41.   Landscape works must be supervised, undertaken and certified by a horticulturist. All
          works must be completed in accordance with this Decision Notice.
          DURING CONSTRUCTION
          Engineering
    42.   The developer must meet any costs to repair damage to any Council asset during
          construction, where damage is a result of the development works. Damage to assets
          must be repaired immediately where it creates a hazard to the community. In
          circumstances where the damage does not create a hazard to the community, it must
          be repaired immediately on completion of the works associated with the
          development.
    43.   All works must be supervised by a Registered Professional Engineer of Queensland
          (RPEQ) who is independent of the Developer and Principal Contractor, and they must
          certify that all works conform to the Operational Works permit.
    44.   All works must be constructed and work procedure undertaken in accordance with:
          a.   The approved plans/documents and conditions detailed in this Decision Notice.
          b.   All relevant Noosa Council Planning Scheme Policies, standard drawings,
               standard specifications and guidelines.
          c.   The latest version of the Healthy Waterways document “Water Sensitive Urban
               Design Technical Design Guidelines for South East Queensland” for all water
               quality devices to be constructed on site.
          Pavement Design and Construction
    45.   Pavement design for privately owned works must be undertaken in accordance with
          the relevant standards. Structural integrity of the driveway and car park areas will
          remain the responsibility of the property owner/developer and must be certified by an
          RPEQ.
          Works within Road Reserve/Reinstatement
    46.   Safe pedestrian access on all streets in the vicinity of the development must be
          maintained at all times. Should footpath/road closures be necessary to carry out
          construction works, Council’s Engineering Officer must be notified prior to the
          proposed closure and all requirements complied with.
    47.   All frontage works must match neatly with existing road and verge/footpath features.
          Additional works beyond the frontage may be required to provide an acceptable
          transition to existing road and verge/footpath profiles.
    48.   Electrical conduits or other services proposed to be installed within existing and
          proposed road reserves under existing sealed carriageways, concrete pathways,
          concrete/sealed driveways or significant vegetation must be installed by boring.
          Trenching is not permitted, unless specifically approved by Council.
          Site Access and Driveways
    49.   Any existing unnecessary or redundant property accesses must be removed, and the
          kerb, footpath and verge area reinstated to match the existing footpath and/or verge
          treatments. Grassed verge areas to be reinstated must be provided with 100 mm
          topsoil and grass seed or turf, and must be maintained by the developer until
          established.
    50.   The following must be complied with during the construction of the required
          crossovers/driveways:
          a.   The driveway surfacing must consist of either an approved hot mixed asphaltic
               concrete or patterned/plain concrete.

                                                                                Page 15 of 89
Log in to download the original file

2017-08-17 Ordinary Meeting Agenda(PDF, 9MB).pdf · 9.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.