Original source · versioned page text
MCU21-0134 - Approved Bushfire Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Management Plan v1 NCES REF: J000953 Lot 189 on MCH1261 – 64 Reserve St, Pomona 4 BUSHFIRE IMPACT REDUCTION MEASURES 4.1 General The following section describes bushfire impact reduction measures to be incorporated into the proposed development to reduce the risk of bushfire impacts to people and property. Implementation of the identified measures is not implied nor intended to advocate that building occupants remain on the site during a bushfire event, nor that people and property will be protected from bushfire impacts. The measures are intended to reduce the potential severity of bushfire impact to the development and not prevent bushfire impact. The bushfire mitigation measures have been derived from: • Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December 2019) (referenced herein as SPP (Bushfire) 2019); and • Queensland Fire and Emergency Services. (2019). Planning for Bushfire Resilient Communities. 4.2 Asset Protection Zones 4.2.1 General Asset Protection Zones (APZ) provide a defensive tool to assist in the reduction of potential bushfire impact to people and property situated in bushfire prone areas. For illustrative purposes, Plate 9 depicts the concept of an APZ surrounding a dwelling in a bushfire prone areas. Plate 9 – Asset Protection Zones The development has been confirmed to be located within a bushfire hazard area hence provision of adequate separation between the proposed works and the hazardous vegetation located on all sides is required to provide a reasonable level of safety to site occupants and emergency services staff. The configuration of APZ’s is typically determined based on the results of the site-specific hazard assessment including risk of bushfire impact, flame length analysis, potential AS3959-2018 Bushfire Attack Levels and SPP Bushfire 2019 Assessment Benchmark setback requirements (Refer section 4.2.3) 4.2.2 State Planning Policy – State Interest Guidance Material (Natural Hazards, Risks and Resilience – Bushfire) December 2019 Assessment Benchmark 4 of the State Planning Policy – state interest guidance material references benchmark separations for new developments however for consistency, can be used to ascertain suitable separations for new buildings on existing lots. Assessment Benchmark 4 states: Development supports, and does not hinder, disaster management response or recovery capacity or capabilities. Where reconfiguring a lot creating lots of greater (or less) than 2000 square metres: To ensure emergency access and operational space for firefighters the subdivision layout results in © 2021 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.