Skip to the record
Every meeting, every word.

Council archive · source document

Beach Road Retreats Stage 1 Conditions · 132007.742.05

Attached to the e-mail 132007.742.05 Request to Extend Relevant Period (Stage 1).

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

132007.742.04

 

 

57. Refuse containers must be provided for premises and the recreation/BBQ area in
accordance with the requirements of the Environmental Protection (Interim Waste)
Regulation 1996 and (Waste Management) Regulation 2000, for the storage and
collection of refuse.

58. The development must allow refuse-loading areas to be located off street. All vehicles
associated with the collection of waste/recyclables, shall enter and leave the site in a
forward direction.

59. A Waste Management Plan (Operational) in accordance with the Noosa North Shore
Eco-Tourism Portal Development, must be submitted for the day-to-day operations and
approved by Council’s Environmental Health Section prior to issue of development
permit for operational works.

60. A Waste Management Plan (Demolition/Construction) in accordance with the Noosa
North Shore Eco-Tourism Portal Development Code, shall be submitted for the
demolition and construction phases of the development and approved by Council’s
Environmental Health Section prior to the issue of the development permit for
operational works.

61. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or
pool pumps etc) shall comply with the following requirements:

The equipment shall be installed and located in a manner that prevents excessive noise
in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
Notices (on-the-spot fines) may apply for offences.
A person must not use equipment on any day if it makes or causes noise to be made —
From 10pm to 7am: More than the lower of either —
e 40 dB(A)
e 3 dB(A) above the background noise level
¢ No audible noise for pool pumps apply during these hours.
From 7am to 7pm: More than the lower of either —
e 50 dB(A)
e 5 dB(A) above the background noise level
From 7pm to 10pm: More than 3 dB(A) above the background noise level.
62. Noise from building works associated with residential development shall comply with the
following —
62.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
62.2. All reasonable measures are taken to minimise noise emissions.
62.3. Not permitted on Sunday or public holidays.
| 5 REFERRAL AGENCY CONDITIONS |

 

The referral agencies applicable to this application are:

Referral Trigger Referral Status | Referral Agency Referral Address
Vegetation Clearing ' Concurrence Department of orelbemass2
Environment and BRISBANE QLD 4001
Wetlands Advice Resource
Management

PD-DA-FM383/5-09/08/2010 Page 8 of 19

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Beach Road Retreats Stage 1 Conditions.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.