Original source · versioned page text
Beach Road Retreats Stage 1 Conditions
Attached to the e-mail 132007.742.05 Request to Extend Relevant Period (Stage 1).
132007.742.04 Erosion and Sediment Control 47. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Management Plans 48. 49. The applicant shall submit reports for the relevant stage in accordance with the Environmental Management Strategy as outlined in Section 6 of the NNSETP Code, unless previously approved by Council for all stages. These reports shall be submitted for approval in conjunction with Operational Works application for the relevant stage. A Construction Management Plan addressing all construction phases of the relevant stage shall be prepared by a suitably qualified person and submitted to Council for approval prior to obtaining a Development Permit for Operational Works. The plan should aim to address every foreseeable problem eg: movements of excavation and construction machinery, building material deliveries, stockpiling of materials etc that is likely to occur during the construction process of the relevant stage and include recommendations on how these can be overcome or minimised. General 50. 51. 52. 53. Digital detailed designs including drawings, calculations, etc shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council’s Planning Scheme Policy PSP05 — Engineering Design Standards — Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Environmental Health 54. 55. 56. Potable drinking water to all sinks, taps and showers is to meet the Australian Drinking Water Standards. Water must be treated to a potable standard and analysed by an approved lab for bacterial quality as directed by Noosa Council. The developer must provide waste storage and disposal facilities at this development in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A wash down are is required with a cold-water tap, hose and drain outlet connected to septic system or approved absorption trench. The drain outlet is to be designed to prevent stormwater entry to the absorption trench. PD-DA-FM383/5-09/08/2010 Page 7 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Beach Road Retreats Stage 1 Conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.