07/1452 - Preliminary building works assessable against planning scheme [As Published]

of 23

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997

Acid sulfate soils 5.

For more information refer to Guide 10.

Unless you answered "none of the above” to 05,
the application requires assessment by
Department of Natural Resources and Water
(RW).

[fan agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

Major hazard facilities or possible 6.

major hazard facilities

For more information refer to Guide 17.

(fyou answered “YES” to Q6, the application
requires assessment by the Department of
Ememency Services (DES).

If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
elation to this matter.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identified’ local government area
and where the surface of the land is: (tick appficable box)

(1 (i) below 20m AHD® and the development will involve the excavation of 1000m3or more of
soil or sediment at or below 5m AHD, or

O (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material

M (iii) none of the above

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

BNO
YES - complete Part L of Form 1

 

Water related development under the | 7.

Water Act 2000

For mare information about items (a) — (f), refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered "none of the above" to Q7,
the application requires assessment by the
Department of Natural Resources and Water
{NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
elation to this matter.

The application involves:

C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
{lick applicable box/es)

(a) in awatercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part K2, Ks, Ks, Ke, or Ko of Form 1 whichever is applicable,

CJ (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ky of Form 1;

(1 (c) for a subartesian bore, in dectared subartesian area’, or in a certain area

 

Removal of quarry material from a 8.

watercourse

For more information refer to Guide 16.
(fyou answered "YES" to 8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

Ifan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

covered by a water resource plan, for use for purposes other than stock and/or
domestic use - complete Part K; of Form 1;
and/or domestic purposes - complete Part K: of Form 1;
(1 (e) for taking overland flow water in certain areas covered by a water resource plan
{J (f)_ for interfering with overland flow water in a drainage and embankment area -
complete Part Kio of Form 1
of a referable dam by more than 10% - complete Part Ks of Form 1; or
® (ii) none of the above.
requiring an allocation notice under the Water Act 2000?
NO

(2 (@) fora subartesian bore, in certain declared subartesian areas, for use for stock
— complete Part Ks of Form 1;
(J (g) for constructing a referable dam? or works that will increase the storage capacity
Does the application involve development for the removal of quarry material from a watercourse®
(J YES - complete Parts Ky and G of Form 1

 

5. The identified ocal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrocke, tsis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redaiiffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHO).

Referable dam is defined under the Wafer Act 2000.
Watercourse is defined in sch 10 of the IPA.

COD

‘The declared ground water areas are listed in Guide 13 Development in a declared catchment area,

Page 3

Log in to download the original (07_1452 - Preliminary building works assessable against planning scheme [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.