2022-07-12 Planning & Environment Meeting Agenda

of 150

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (26.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      12 JULY 2022


                AS/NZS2890.1:2004 - Parking Facilities;
          c.    The additional visitor car space must be provided adjacent to one of the proposed
                visitor spaces.
    26.   All car parking areas and access driveways must be maintained exclusively for vehicle
          parking and manoeuvring and kept in a tidy and safe condition at all times.
    27.   Directional signage must be provided to direct visitors to the car parking spaces
          provided on site.
    Pedestrian and Bicycle Facilities
    28.   Pedestrian and bicycle facilities must be provided for the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.    a 2.0 metre wide footpath within the road verge for the entire length of the site’s
                frontage to Toolar Street together with transitions to the existing pathway on
                either side of the site
          Condition 28 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
          infrastructure.
    Stormwater Drainage
    29.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and the Queensland Urban Drainage Manual, and must include in
          particular:
          a.    7kL of storage for roofwater capture and reuse. The storage tank is to receive
                only roofwater runoff and is to be provided with a solid lid to prevent the inflow of
                surface runoff. A backflow prevention device is to be fitted to restrict the backflow
                of water in the detention tank into the roofwater storage;
          b.    Captured roofwater is to be plumbed to communal non-potable fixtures, including
                bin washdown and landscape irrigation;
          c.    Stormwater pits receiving surface runoff are to be provided with litter-baskets;
                and
          d.    An underground detention tank is to be provided within the site to ensure site
                discharges achieve non-worsening for the range of durations relevant to the
                downstream drainage network.
    30.   In conjunction with the development application for Operational Works, revised
          detention tank design calculations and documentation is to be provided which identifies
          all assumptions and the methodology applied in deriving the tank design, and which is
          based on the recommendations of Australian Rainfall and Runoff 2019 and QUDM
          2017. Ensemble temporal patterns are to be utilised for the analysis as well as the
          current rainfall intensities recommended by Bureau of Meteorology. The detention tank
          is to achieve non-worsening for the range of durations and recurrence intervals relevant
          to the downstream drainage network.
          Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
          infrastructure.
    Services
    31.   Reticulated electricity and telecommunication services must be provided to the
          development in accordance with the standards and requirements of the relevant
          service provider.



                                                                                    Page 73 of 150
Log in to download the original file

2022-07-12 Planning & Environment Meeting Agenda(PDF, 25MB).pdf · 26.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.