Log in to see the plans as drawn Performance outcomes Acceptable outcomes
suppression and on product stockpiles, overburden
stockpiles, revegetation or rehabilitation areas and wheel
wash facilities.
Hours of operation
PO28 No acceptable outcome provided
Extractive industry activities occurs at times that will not result in
disturbance to surrounding uses.
Management of Operations
PO29 No acceptable outcome provided
Noise, vibration and dust emissions from the development i s
managed to acceptable levels.
PO30
Operations minimise lighting impacts on roads and surrounding No acceptable outcome provided
properties.
PO31
Extractive industry operation areas are fenced to prevent No acceptable outcome provided
unauthorised or accidental public entry.
PO32
Development does not compromise the stability, safety or No acceptable outcome provided
operation of infrastructure.
PO33
Development is designed and managed to minimise the risk and No acceptable outcome provided
impact of any accidental spills or releases of chemicals and other
materials that may contaminate soil, stormwater, groundwater or
air.
Landscaping
PO34 No acceptable outcome provided
Landscaping complements biodiversity values in the surrounding
area.
Rehabilitation
PO35
Rehabilitation of the site, over the life of the project and on its No acceptable outcome provided
completion:
(a) provides progressive/ staged rehabilitation works;
(b) includes appropriate cleanup works (taking particular
account of areas of possible soil or water contamination);
(c) results in a stable final landform;
(d) provides suitable drainage and hydraulic conditions; and
(e) achieves a suitable degree of revegetation consistent with
potential post extraction land use.
PO36
Rehabilitation allows for suitable use of any water storage created No acceptable outcome provided
through the extraction process, having regard to water quality,
hydraulic conditions, land form and vegetation.
PO37
Rehabilitation works for each operational stage are bonded to No acceptable outcome provided
ensure the effective return of disturbed areas to acceptable land
use suitability.
9.3.11 Infrastructure Activities Code
NOOSA PLAN 2020 Page 62 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.