Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 9.3.11.1            Application
 This code applies to acceptable development which is subject to requirements and to assessable development identified as
 requiring assessment against the infrastructure activities code by the tables of assessment in Part 5 (Tables of assessment).

 9.3.11.2            Purpose and Overall Outcomes
 (1)    The purpose of the Infrastructure Activities code is to ensure major utilities, telecommunications and other infrastructure
        activities:
        (a)    are provided in a coordinated and efficient way to meet the needs of existing and future communities; and
        (b)    are developed and designed in a manner which causes no adverse effects on public health, the environment and the
               amenity of the surrounding premises and local communities.
 (2)    The overall outcomes sought for the Infrastructure activities code are:
        (a)    Residents and visitors have access to adequate levels of infrastructure to meet their immediate and future needs.
        (b)    Infrastructure activities are visually integrated with their natural, rural or urban setting and do not adversely affect the
               amenity of the major road network, surrounding sensitive land uses or the rural or residential amenity enjoyed by
               residents and visitors to Noosa.
        (c)    Infrastructure activities do not adversely impact upon community wellbeing and does not pose a threat to public
               health and safety.
        (d)    Where practicable, infrastructure activities are integrated and co­located with other compatible uses and facilities.
        (e)    The design of infrastructure activities incorporates convenient and safe access to the facility.
        (f)    Utility infrastructure and facilities maximise the efficient use of natural resources, including water and energy.
        (g)    Essential infrastructure, telecommunications and major utility infrastructure and facilities are resilient to future
               impacts of climate change and are designed to function during and immediately after flood events.
 FOR ACCEPTED DEVELOPMENT
 The requirements for Accepted development are the acceptable outcomes listed in the Table of Assessment. Accepted
 development that complies with all the acceptable solutions is considered to satisfy the requirements. If development complies
 with some, but not all, acceptable outcomes, an application for Code assessment will be necessary and the application will be
 assessed against the relevant Performance outcome(s).

 FOR ASSESSABLE DEVELOPMENT
 Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
 outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
 considered as one way to satisfy the corresponding performance outcome.

  Table 9.3.11.3 ­ Criteria for assessment

 Location            Table 9.3.11.3 Criteria for assessment (part)
  Performance outcomes                                                 Acceptable Outcomes

  Location
  PO1                                                                  AO1.1
  Infrastructure activities establish in a location:                   Infrastructure activities are established on a site that is well
  (a)    relative to the infrastructure network it services;           located relative to any supply or distribution network.

  (b)    where opportunities for cost efficiencies and reduction in
                                                                       AO1.2
         environmental and social impacts are maximised; and
                                                                       Where practicable, infrastructure activities are co­located with
  (c)    with a high standard of accessibility for maintenance         another utility of a similar or compatible type.
         purposes and at times of emergency.
                                                                       AO1.3
                                                                       Infrastructure activities are located on a site that can be easily
                                                                       accessed for maintenance purposes or at times of emergency.



NOOSA PLAN 2020                                                                                                                    Page 63 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.