Sloping sites
PO9 AO9
On sloping sites development follows the natural landform Cut or fill is less than 1.5 metres in depth relative to the
wherever practical and excavation or filling is minimal. natural ground level.
Infrastructure protection
PO10
Earthworks and vehicular access do not adversely impact on the No acceptable outcome provided
capacity, operations and maintenance of existing infrastructure.
Environmental protection
PO11
Earthworks minimise any adverse impact upon groundwater, No acceptable outcome provided
watercourses, drainage lines, wetlands, and native vegetation.
Dams
PO12 AO12.1
Dam location and construction does not impact upon Where the site is in the Rural zone—
neighbouring properties or road reserves, in terms of— (a) the land has a slope of less than 25% (1:4);
(a) hydrology; (b) the earthworks including cut and fill batters and retaining
(b) alteration of existing overland flow paths and patterns; walls are setback a minimum of 50 metres from the
(c) landslide or failure of dam wall; and property boundary; and
(d) effluent disposal areas. (c) the size of the lot is greater than 5 hectares.
AO12.2
Where the site is in the Rural residential zone or the Rural
zone and the lot is less than 5 hectares:
(a) the land has a slope of less than 1:6;
(b) the earthworks including cut and fill batters and retaining
walls are setback a minimum of 20 metres from the
property boundary; and
(c) the dam work involves less than 500m³ of material.
AO12.3
For all other zones—
No acceptable outcome provided
9.4.3 Existing Services Code
9.4.3.1 Application
(1) This code applies to assessable development identified as requiring assessment against the Existing Service Code by the tables
of assessment in Part 5 (Tables of Assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
9.4.3.2 Purpose and Overall Outcomes
(1) The purpose of the Existing Services Code is to ensure existing underground infrastructure is protected from damage
caused by development.
(2) The overall outcomes sought for the Existing services code are:
NOOSA PLAN 2020 Page 93 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.