Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
        (a)    Underground infrastructure is accessible for maintenance purposes.
        (b)    Existing services are identified and methods of protection and access are implemented in the design of the development.

  Table 9.4.3.3 ­ Criteria for assessment

 Setbacks, easements and maintenance                           Table 9.4.3.3 Criteria for assessment (part)
  Performance outcomes                                                   Acceptable Outcomes
  Assessable development

  PO1                                                                    No acceptable outcome provided
  Development near a stormwater drain, overland flow path or
  associated structure does not—
  (a)    adversely affect the function of the service;
  (b)    place an additional load on the service; and
  (c)    unduly increase future maintenance costs.


  PO2                                                               AO2.1
  Maintenance access is provided to all stormwater drains, overland For trunk infrastructure, a registered easement in favour of Council
  flow paths and associated structures.                             is created over all underground infrastructure located in private
                                                                    property.

                                                                         AO2.2
                                                                         The width of the easement required is in accordance with
                                                                         Council’s Planning Scheme Policy PSP6 Engineering Design
                                                                         Standards – Roads, drainage and earthworks.

                                                                         AO2.3
                                                                         The easement is centred over the centreline of the infrastructure.


 9.4.4 Fire services for common private title code

 9.4.4.1              Application
 (1)    This code applies to assessable development identified as requiring assessment against the Fire Services code by the tables of
        assessment in Part 5 (Tables of Assessment)where the development:
         (a)      is for a material change of use or reconfiguring a lot for the purpose of residential, commercial or industrial development
                  where part of the development or any building is more than 90 metres from the nearest located fire hydrant; or
         (b)      for attached and detached buildings, not covered in other legislation or planning provisions mandating fire hydrants; and
         (c)      the proposed development will include streets and common access ways within a common private title in areas serviced
                  by reticulated water.

 (2)    All provisions in this code are assessment benchmarks for applicable assessable development.


 9.4.4.2              Purpose and overall outcomes
 (1)    The purpose of the Fire services code is to ensure development in urban areas accessed by common private title have
        appropriate fire hydrant infrastructure and unimpeded access for Queensland Fire and Emergency Service (QFES) vehicles for the
        protection of people, property and the environment from fire and chemical incidents.
 (2)    The overall outcomes sought for the Fire services code are:
        (a)    Development provides for suitable fire hydrant infrastructure which is located to safely, efficiently and effectively access
               water supply and is integrated into the overall design of the development.
        (b)    Development provides for unimpeded access for QFES vehicles to fire hydrant infrastructure.




NOOSA PLAN 2020                                                                                                                     Page 94 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.