Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
for people with disabilities;
(d) Disability standards for accessible public transport 2002
made under section 31(1) of the Disability Discrimination
Act 1992; and
(e) AS/NZS 1158.3.1 – Lighting for roads and public spaces,
Part 3.1: Pedestrian area (category P) lighting –
Performance and design requirements.
Environmental Protection Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
Environmental Protection
PO12 AO12.1
Road infrastructure is located and aligned so as to— Roads follow the edge of existing disturbed areas, or
(a) minimise disturbance to native vegetation and/or other alternatively, these works are colocated with other services
habitat areas; within a combined utility corridor.
(b) protect and maintain wildlife corridor movements and the
AO12.2
safety of native fauna;
Low impact construction techniques are used around areas of
(c) provide for compensatory habitat establishment and vegetation to be retained to minimise interference with the
maintenance; vegetation.
(d) minimise changes to the hydrological regime, including
drainage patterns, runoff and water quality; AO12.3
Roads avoid native vegetation and provide appropriate fauna
(e) avoid crossing watercourses, drainage lines and
movement corridors and protection measures.
wetlands, but where such crossings are unavoidable,
disturbed areas are reinstated and revegetated on
Editor’s Note— Measures may include fauna underpasses,
completion of works; and
ropes, fencing and the like.
(f) minimise bulk earthworks.
AO12.4
Road infrastructure within or adjacent to native habitat
incorporates fences which allow for protected wildlife movement
and controls unrestricted access of domestic cats and dogs.
AO12.5
Native vegetation is protected from clearing or construction
activities by—
(a) clearly marking vegetation to be retained with flagging
tape;
(b) installing protective fencing around the dripline of
vegetation; and
(c) ensuring stock piling, storage and vehicle parking occur
outside the areas of vegetation to be retained.
AO12.6
Where clearance of habitat is unavoidable, once the area
disturbed by the works is reestablished, replacement habitat is
planted in proximity of the works to create native fauna habitat
suitable for the area and maintained for the life of the works.
PO13 AO13
Road infrastructure is constructed to minimise adverse Road infrastructure is constructed in accordance with Council’s
environmental impacts, including from runoff and erosion. Planning Scheme Policy PSP6 Engineering Design Standards –
NOOSA PLAN 2020 Page 112 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.