Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
Roads, drainage and earthworks
External Works and Infrastructure Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
External Works and Infrastructure
PO14 AO14
Development is provided with external works— Where not already existing, the following infrastructure
(a) along the full extent of the frontage of the site to an components are provided at the frontage of the site—
appropriate standard having regard to the specified (a) full width sealed road;
function of the road; and (b) concrete kerb and channel where appropriate;
(b) provided beyond the site’s frontage if required. (c) forming and grading to footpaths;
(d) vehicular kerb and footpath crossings;
(e) a constructed bikeway;
(f) a constructed footpath;
(g) a constructed carriageway;
(h) required alterations to public utility mains, services or
installations;
(i) construction of any required alterations to public utility
mains, services or installations;
(j) stormwater drainage works; and
(k) installation of electrical conduits.
PO15
Any alterations or repairs to infrastructure as a result of the No acceptable outcome provided
development are made at no cost to Council.
PO16
Road infrastructure is proven to be suitable for its use prior to No acceptable outcome provided
Council accepting the dedicated asset.
Staged development Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
Staged development
PO17
Staged development is planned, designed and constructed to No acceptable outcome provided
ensure that—
(a) each stage of the development can be constructed without
interruption to services and utilities provided to the
previous stages;
(b) the infrastructure provided is capable of servicing the
entire development; and
(c) the materials used are consistent throughout the
development.
NOOSA PLAN 2020 Page 113 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.