Log in to see the plans as drawn 9.4.8 Water Quality and Drainage Code
9.4.8.1 Application
(1) This code applies to assessable development identified as requiring assessment against the Water Quality and Drainage code
by the tables of assessment in Part 5 (Tables of assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development
9.4.8.2 Purpose and overall outcomes
(1) The purpose of the Water Quality and Drainage code is to ensure development is planned, designed, constructed and operated to
manage wastewater, stormwater, groundwater and environmental flows and as part of an integrated water cycle in ways that
protect environmental values, water quality and public health.
(2) The overall outcomes sought for the Water quality and drainage code are:
(a) Waterways, wetlands, drainage lines, receiving environments and other ecologically important areas are protected and
enhanced by managing the quality and quantity of stormwater runoff from development in accordance with best practice;
(b) Stormwater drainage systems are designed and constructed to effectively manage or convey stormwater in a way that
protects people, property and the natural environment;
(c) Stormwater infrastructure and treatment systems are compatible with existing infrastructure and are designed and
constructed to be cost effective across their design life;
(d) Stormwater design and management incorporates consideration of climate change impacts to ensure the intended
function and capacity of the stormwater infrastructure and treatment systems are maintained over time;
(e) Stormwater infrastructure provides an appropriate level of flood immunity for roads based on desired standards of service
identified for different flood hazard areas;
(f) Stormwater treatment systems are visually integrated into all development designs in a manner that incorporates natural
features and habitats, as well as education opportunities to raise awareness of the connection of the development to its
receiving waters;
(g) Stormwater treatment systems are multifunctional providing for stormwater conveyance, protection of ecologically important
areas, passive recreation and erosion and sediment control;
(h) Hydrologic regimes are maintained to predevelopment conditions to maintain waterway stability, protect ecology and
groundwater dependent ecosystems, maintain suitable fish passage, and mitigate flood risk to people and property; and
(i) Development is designed, constructed and operated to facilitate erosion and drainage control and avoid release of
prescribed water contaminants into receiving waters.
Table 9.4.8.3 Criteria for assessment
Stormwater drainage design Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Stormwater drainage design
PO1 AO1
The development and its stormwater management system is A stormwater management plan is prepared consistent
planned and designed having regard to: with PSP6 Engineering Design Standards Roads, drainage
(a) the natural features of the site; and earthworks.
(b) the need to avoid impacts and potential risks to ecologically
important areas;
(c) the likely effectiveness of erosion and sediment control and
stormwater drainage measures during rainfall events
during and post construction; and
(d) the need to protect environmental values and water quality
of receiving waters both during and post construction.
PO2 AO2.1
Stormwater drainage infrastructure is planned, designed and Stormwater drainage planning, design and construction is in
NOOSA PLAN 2020 Page 114 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.