Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance Outcomes                                                Acceptable Outcomes
  constructed to:                                                     accordance with PSP6 Engineering Design Standards ­ Roads,
  (a)    incorporate allowance for increased flood risk and tidal     drainage and earthworks and the latest version of the
         inundation through pipework as a result of cilmate change    Queensland Urban Drainage Design Manual.
         and sea level rise;
  (b)    ensure the development is adequately drained; and            AO2.2
                                                                      The stormwater drainage system connects to a lawful point of
  (c)    ensure stormwater is managed and lawfully discharged         discharge in accordance with PSP6 Engineering Design
         without altering stormwater drainage characteristics
         external to the site.                                        Standards ­ Roads, drainage and earthworks.

                                                                      AO2.3
                                                                      Stormwater flows discharging from the development are
                                                                      demonstrated to be consistent with pre­development
                                                                      characteristics.

                                                                      AO2.4
                                                                      Development provides for the management of stormwater to
                                                                      incorporate appropriate allowance for climate change impacts
                                                                      (including rainfall intensity and sea level rise), in accordance with
                                                                      PSP6 Engineering Design Standards – Roads, Drainage and
                                                                      Earthworks.


  PO3                                                                 AO3.1
  Stormwater drainage infrastructure conveys run­off in a manner      Stormwater drainage infrastructure meets the desired standards
  that allows roads to deliver desired standards of service           of service for roads functionality set out in PSP6 Engineering
  appropriate to the local conditions and local stormwater drainage   Design Standards ­ Roads, Drainage and Earthworks.
  characteristics.
  PO4                                                                 AO4.1
  Stormwater infrastructure is compatible with existing               The location, design and construction of stormwater drainage
  infrastructure, allows for easy access for the ongoing              structures is in accordance with PSP6 Engineering Design
  maintenance by Council, is cost effective across its design life.   Standards ­ Roads, drainage and earthworks.

                                                                      AO4.2
                                                                      Where infrastructure is located on private land an easement is
                                                                      dedicated over the infrastructure in accordance with PSP6
                                                                      Engineering Design Standards ­ Roads, drainage and
                                                                      earthworks.

                                                                      AO4.3
                                                                      Any alterations or repairs to infrastructure as a result of the
                                                                      development are made at no cost to Council.

                                                                      AO4.4
                                                                      Development avoids stormwater inflow and infiltration to the
                                                                      sewer infrastructure network.

                                                                      AO4.5
                                                                      Stormwater infrastructure is designed to minimise maintenance
                                                                      costs and the requirement for specialized equipment for
                                                                      maintenance techniques.


  PO5                                                                 AO5.1
  Stormwater drainage infrastructure is aligned to avoid crossing     Stormwater drainage infrastructure avoids crossing waterways,
  waterways, wetlands, drainage lines and ecological important        wetlands drainage lines and ecologically important areas or
  areas, or where it is demonstrated this is unavoidable, disturbed   follows the edge of existing disturbed areas.
  areas are reinstated and revegetated upon completion of works.
                                                                      AO5.2


NOOSA PLAN 2020                                                                                                                 Page 115 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.