Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance Outcomes                                               Acceptable Outcomes
                                                                     public assets are established and maintained during the
                                                                     maintenance period to ensure optimal vegetated growth and that
                                                                     the functional elements of the system achieve the design function
                                                                     at the end of the maintenance period.
  PO9                                                             AO9.1
  Treatment systems are designed to eliminate or minimise health, Free draining inlets and outlets are provided to ensure that waters
  safety and aesthetic hazards, including risks associated with   do not pond for more than 24 hours.
  insect breeding, odour and public safety.
                                                                  AO9.2
                                                                  Developments are designed to eliminate retaining walls in excess
                                                                  of 0.8m for any water quality treatment device.


 Hydrology and waterway stability                   Table 9.4.8.3 Criteria for assessment (part)
  Performance Outcomes                                               Acceptable Outcomes
  Hydrology and waterway stability
  PO10                                                               AO10
  Development prevents increased bed and bank erosion and            The development is designed to:
  sedimentation in receiving waterways by avoiding changes in low    (a)   limit the peak 1 year ARI event discharge within the
  rate, peak flow run­off and flow duration.                               receiving waterway to the pre­development peak 1 year
                                                                           discharge;
                                                                     (b)   maximise pervious areas by using pervious alternatives for
                                                                           otherwise impervious areas wherever possible;
                                                                     (c)   provide for capture and reuse of stormwater for non­potable
                                                                           purposes for gardening, toilet flushing, laundry and hot
                                                                           water supply uses;
                                                                     (d)   incorporate appropriate detention features; and
                                                                     (e)   incorporate natural channel design principles

                                                                     Editor’s note: The Sustainable Building Design Code includes
                                                                     requirements for stormwater capture and reuse.
  PO11                                                               AO11.1
  Water sensitive urban design principles are applied to achieve     The design and construction of a natural channel or natural
  multifunctional design of waterways, wetlands and drainage lines   channel rehabilitation works are in accordance with the Natural
  that provide for:                                                  Channel Design Guidelines (Brisbane City Council) having regard
  (a)    stormwater conveyance that uses natural channel design;     to local topography, geology and geomorphology.

  (b)    protection of landscape features and ecological important
                                                                     AO11.2
         areas including terrestrial and aquatic habitat;
                                                                     Landscape features, plant species and habitat types used in
  (c)    aesthetic and passive recreation values;                    stormwater conveyance channels are complementary to the local
  (d)    flood management and conveyance of external catchment       context and natural waterways.
         stormwater through the development;
                                                                     AO11.3
  (e)    landscaping that incorporates local native species; and
                                                                     Bank and bed stability and planting densities result in a stable
  (f)    bed and bank stability.                                     channel over the long term and minimal potential for pest plant
                                                                     species.

                                                                     AO11.4
                                                                     Water Sensitive Design measures are incorporated into the
                                                                     development, as detailed in the document Water Sensitive
                                                                     Designs small improvements, new ideas, concepts and sketch
                                                                     designs for stormwater filtration systems (Healthy Waterways
                                                                     Water by Design).

                                                                     AO11.5


NOOSA PLAN 2020                                                                                                              Page 117 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.