Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance Outcomes Acceptable Outcomes
Floodplain management is designed in accordance with the
Framework for the Integration of Flood and Stormwater
Management into Open Space published by Healthy Waterways
Water by Design (version current at the time of development
application)
PO12 AO12.1
Development protects instream ecology by maintaining pre Where runoff from or within the site passes through or drains to
development low flow discharge regimes and maintaining fish natural channels, waterways or wetlands, development protects in
passages. steam ecology by maintaining predevelopment low flow
discharge regimes in accordance with the frequent flow
management objectives in PSP6 Engineering Design Standards
Roads, drainage and earthworks
AO12.2
Instream structures such as roads, bridges, culverts, and other
stormwater infrastructure do not cause barriers to fish passage
and facilitate the movement of terrestrial and aquatic fauna along
waterway corridors.
AO12.3
Benthic substrate retains a continuous grade with the direction
of flow consistent with the natural bed profile.
PO13 AO13.1
Development is designed and constructed to maintain surface The location and form of stormwater discharge points do not alter
and ground water balances that sustain the environmental values the predevelopment hydrology of receiving surface water or
of water dependent ecosystems, including downstream aquatic, groundwater.
riparian, wetland and terrestrial ecosystems.
AO13.2
Developments located on groundwater recharge or discharge
areas are designed and managed in accordance with a
groundwater recharge and discharge management plan prepared
by a suitably experienced and qualified groundwater hydrologist.
The groundwater recharge or discharge must demonstrate that
the development does not affect groundwater balances beyond
the property boundaries.
Editor's Note— PSP6 Engineering Design Standards Roads,
drainage and earthworks provides guidance on prepare a
groundwater recharge and discharge plan.
Construction and establishment of stormwater management systems Table 9.4.8.3 Criteria for
assessment (part)
Performance Outcomes Acceptable Outcomes
Construction and establishment of stormwater management
systems
PO14 AO14.1
Construction methods provide for appropriate controls to avoid An erosion and sediment control plan prepared in accordance
entry and transport of litter, sediment, and associated with the International Erosion Control Association Best Practice
Books demonstrates that the capture and release of stormwater
prescribed water contaminants into receiving waters.
achieves the design objectives listed in Table A: Construction
phase – stormwater management design objectives of the State
Editor's note— Water contaminants are prescribed in the Planning Policy (Appendix 2).
Environmental Protection Act 1994.
Editor’s note— PSP6 Engineering Design Standards Roads,
NOOSA PLAN 2020 Page 118 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.