Skip to the record
Every meeting, every word.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance Outcomes                                              Acceptable Outcomes
                                                                    Floodplain management is designed in accordance with the
                                                                    Framework for the Integration of Flood and Stormwater
                                                                    Management into Open Space published by Healthy Waterways
                                                                    Water by Design (version current at the time of development
                                                                    application)
  PO12                                                              AO12.1
  Development protects in­stream ecology by maintaining pre­        Where run­off from or within the site passes through or drains to
  development low flow discharge regimes and maintaining fish       natural channels, waterways or wetlands, development protects in­
  passages.                                                         steam ecology by maintaining pre­development low flow
                                                                    discharge regimes in accordance with the frequent flow
                                                                    management objectives in PSP6 Engineering Design Standards ­
                                                                    Roads, drainage and earthworks

                                                                    AO12.2
                                                                    Instream structures such as roads, bridges, culverts, and other
                                                                    stormwater infrastructure do not cause barriers to fish passage
                                                                    and facilitate the movement of terrestrial and aquatic fauna along
                                                                    waterway corridors.

                                                                    AO12.3
                                                                    Benthic substrate retains a continuous grade with the direction
                                                                    of flow consistent with the natural bed profile.
  PO13                                                              AO13.1
  Development is designed and constructed to maintain surface       The location and form of stormwater discharge points do not alter
  and ground water balances that sustain the environmental values   the pre­development hydrology of receiving surface water or
  of water dependent ecosystems, including downstream aquatic,      groundwater.
  riparian, wetland and terrestrial ecosystems.
                                                                    AO13.2
                                                                    Developments located on groundwater recharge or discharge
                                                                    areas are designed and managed in accordance with a
                                                                    groundwater recharge and discharge management plan prepared
                                                                    by a suitably experienced and qualified groundwater hydrologist.
                                                                    The groundwater recharge or discharge must demonstrate that
                                                                    the development does not affect groundwater balances beyond
                                                                    the property boundaries.

                                                                    Editor's Note— PSP6 Engineering Design Standards ­ Roads,
                                                                    drainage and earthworks provides guidance on prepare a
                                                                    groundwater recharge and discharge plan.



 Construction and establishment of stormwater management systems                                    Table 9.4.8.3 Criteria for
 assessment (part)
  Performance Outcomes                                              Acceptable Outcomes
  Construction and establishment of stormwater management
  systems
  PO14                                                              AO14.1
  Construction methods provide for appropriate controls to avoid    An erosion and sediment control plan prepared in accordance
  entry and transport of litter, sediment, and associated           with the International Erosion Control Association Best Practice
                                                                    Books demonstrates that the capture and release of stormwater
  prescribed water contaminants into receiving waters.
                                                                    achieves the design objectives listed in Table A: Construction
                                                                    phase – stormwater management design objectives of the State
  Editor's note— Water contaminants are prescribed in the           Planning Policy (Appendix 2).
  Environmental Protection Act 1994.
                                                                    Editor’s note— PSP6 Engineering Design Standards ­ Roads,


NOOSA PLAN 2020                                                                                                             Page 118 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.