2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance Outcomes                                            Acceptable Outcomes
                                                                  drainage and earthworks provides guidance on requirements for
                                                                  preparing an Erosion Management Plan.

                                                                  AO14.2
                                                                  Construction works are designed and managed to restrict the
                                                                  extent of clearing and soil exposure to the minimum necessary for
                                                                  access, and safe construction at any one time.

                                                                  AO14.3
                                                                  For buildings:
                                                                  (a)   upstream runoff is diverted around the construction site;
                                                                  (b)   sediment barriers are provided downslope of disturbed
                                                                        areas to prevent sediment washing into gutters, drains and
                                                                        waterways , wetlands or drainage lines either on or off the
                                                                        site; and
                                                                  (c)   temporary or permanent downpipes are connected to the
                                                                        stormwater system before laying the roof; or
                                                                  (d)   localised erosion is avoided by directing flow from
                                                                        downpipes over non­erosive areas.

                                                                  AO14.4
                                                                  Chemical flocculants used as part of an erosion and sediment
                                                                  control plan do not harm the environmental values within
                                                                  receiving waters.

                                                                  AO14.5
                                                                  Appropriately sized litter containment areas, with provision for
                                                                  sorting recyclables are provided for the type of litter expected to be
                                                                  generated onsite.


 Wastewater management and effluent disposal                      Table 9.4.8.3 Criteria for assessment (part)
  Performance Outcomes                                            Acceptable Outcomes
  Wastewater management and effluent disposal

  PO15                                                            AO15
  Development does not discharge wastewater unless it can be      Wastewater (non­sewage) generated from the development is
  demonstrated to not compromise environmental values of          collected and contained on­site, and is:
  waters and water quality objectives.                            (a)   lawfully disposed to sewer; or
                                                                  (b)   transferred off­site for treatment/disposal to an
  Editor’s Note—Environmental values of waters and water                appropriately licenced facility;
  quality objectives are prescribed in Schedule 1 of the                reused on­site in a closed­cycle irrigation scheme,
                                                                  (c)
  Environmental Protection (Water) Policy 2009.                         industrial processes, washing or cleaning or other
                                                                        purpose; or
                                                                  (d)   treated to meet the drinking water supply environmental
                                                                        values prior to release.


                                                                  Editor’s Note—The Plumbing and Drainage Act 2003 sets out
                                                                  requirements for wastewater management.
  PO16                                                            AO16
  On­site effluent treatment and disposal systems are designed,   An onsite effluent system and disposal area is:
  constructed and managed to not compromise the environmental     (a)   not located on a slope greater than 1 in (10%);
  values of waters and water quality objectives.
                                                                  (b)   not located at or below the 1% annual exceedance
                                                                        probability (AEP flood event);


NOOSA PLAN 2020                                                                                                              Page 119 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.