Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix

of 389

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (19.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
 Note—For further information and guidance please refer to DA forms guide link : Relevant plans


          (e)     supporting technical studies as identified through a thorough planning assessment or pre­lodgement advice from Council;
          (f)     more complex applications and their content should be determined on a case by case basis. It is recommended ongoing
                  contact with Council should be undertaken during the preparation of any planning report relating to a complex application to
                  determine the detail of its content.

 Figure 1 ­ Example of streetscape elevation




 SC6.2.3 Technical plans and reports content

 (1)     In certain circumstances technical plans and reports may be required to satisfy outcomes nominated within a planning scheme
         code. The details contained within this policy provide advice and guidance about the typical content that is to be included in such
         plans and reports.
 (2)     In instances where such plans or reports are not provided as part of the submitted application, Council may request them to be
         provided as part of an information request.
 (3)     Details of the requirements for the following assessments/reports are located in Appendix 1
         (a)     traffic assessment report;
         (b)     acoustic assessment;
         (c)     stormwater report;
         (d)     economic impact assessment report;
         (e)     social impact assessment report;
         (f)     heritage and character analysis report;
         (g)     building design assessment;
         (h)     infrastructure activities (including Gas Pipeline Buffer) assessment;
         (i)     extractive industry assessment; and
         (j)     a safety and security management plan.
    Note— Additional requirements for bushfire, acid sulfate soils, flood hazard, water catchment and landslip areas are located in PSP9/10; Hazards; requirements for flora and
    fauna assessment are in PSP4 – Ecological Assessment Guidelines.


 SC6.2.4 Appendix 1 ­ Requirements for technical assessments and reports

 Traffic Impact Assessment Report
 (1)     Compliance with the Transport and parking code may be demonstrated (in part) by the submission of a traffic impact assessment
         report prepared by a competent suitably qualified and experienced traffic engineer in accordance with the following guidelines.
 (2)     As a minimum, the traffic impact assessment report should provide:
         (a)     an assessment of the traffic generation and movements and/or on­site manoeuvring associated with the proposed
                 development;
         (b)     an assessment of the proposal and its impacts in the context of the surrounding road network; and



NOOSA PLAN 2020                                                                                                                                                     Page 3 of 99
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix.pdf · 19.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.