Skip to the record
For the highest quality transcripts.

Council archive · source document

Volume 2 - Code Responses · 132006.823

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                    COLUMN 1                                            COLUMN 2                                             ASSESSMENT
              SPECIFIC OUTCOMES                        PROBABLE SOLUTIONS (if code assessable)
                                                     S8.3
                                                     Road infrastructure within or adjacent to native       Domestic cats and dogs are to be prohibited within
                                                     habitat incorporates fences which allow for            the resort
                                                     protected wildlife movement and controls
                                                     unrestricted access of domestic cats and dogs;
                                                     AND

                                                     S8.4
                                                     Native vegetation is protected from clearing or        Development will comply with prescribed solution.
                                                     construction activities by                             Vegetation to be retained will be clearly identified
                                                     a) clearly marking vegetation to be retained with      on construction documentation. On site
                                                         flagging tap;                                      protective fencing will be erected around the drip-
                                                     b) installing protective fencing around the dripline   line of vegetation within the works zone and
                                                        of vegetation; and                                  between the site of works and the rest of the site.
                                                     c) ensuring stock piling, storage and vehicle          The fencing will prevent vehicles entering
                                                        parking occur outside the areas of vegetation to    protected areas and ensure stock-piling and storage
                                                        be retained;                                        of construction materials and vehicle parking occur
                                                     AND                                                    within the designated work areas.

                                                     S8.5
                                                     Low impact construction techniques are used            On site protective fencing erected around the drip-
                                                     around areas of vegetation to be retained to           line of vegetation within the works zone and
                                                     minimise interference with the vegetation              between the site of works and the rest of the site
                                                                                                            will be utilised to minimise interference with
                                                                                                            vegetation.
O9                                                   S9.1                                                   Not applicable.
Roads and stormwater drainage infrastructure is      No solution provided.                                  No roads and stormwater drainage are to be
proven to be suitable for its use prior to Council                                                          dedicated as a Council asset.
accepting the dedicated asset.



                                                                                                                                              Volume II: Code Responses

                                                                                                                                              Viridian Noosa Project
                                                                                                                                              Viridian Stage 3

Transport, Roads and Drainage Code                                                                                                            11 April 2006     Page 109

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.