Volume 2 - Code Responses · 132006.823
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
O2 S2.1 Complies with probable solution.
Water supply infrastructure is constructed Water supply infrastructure is constructed in No additional water supply reticulation
a) in accordance with appropriate engineering accordance with Section 6 of PSP6 Engineering infrastructure is required. All water supply
standards; and Design Standards Water and Sewerage; infrastructure required for the site has previously
b) to minimise adverse environmental impacts. AND been constructed in accordance with the
requirements of the existing site Development
S2.2 Approval.
Erosion and sediment control measures are
designed and implemented in accordance with the
Institution of Engineers Australia (Queensland Division)
Soil Erosion and Sediment Control - Guidelines for
Queensland Construction Sites.
O3 S3.1 Complies with specific outcome.
Water supply infrastructure is proven to be suitable No solution provided. No additional water supply reticulation
for its use prior to Council accepting the dedicated infrastructure is required.
asset.
O4 S4.1 Complies with specific outcome.
Water supply infrastructure is provided with all No solution provided. No additional water supply infrastructure is
supporting technical documentation. required.
O5 S5.1 Not applicable.
Where buildings or other structures are in proximity The footing of any building or structure is located No buildings are being developed in close
to Council s water supply infrastructure, provision clear of the zone of influence but no closer than 1.5m proximity to Council water supply reticulation
is made to protect the infrastructure from physical (measured horizontally) from infrastructure infrastructure.
damage and to allow ongoing maintenance by including sewers, water mains and stormwater
Council. structures;
AND
S5.2
A registered easement in favour of Council is No easements are required.
created over all underground infrastructure located
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Water Supply and Sewerage Reticulation Code 11 April 2006 Page 138
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.