Volume 2 - Code Responses · 132006.823

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                     COLUMN 1                                               COLUMN 2                                                ASSESSMENT
              SPECIFIC OUTCOMES                          PROBABLE SOLUTIONS (if code assessable)
O2                                                     S2.1                                                       Complies with probable solution.
Water supply infrastructure is constructed             Water supply infrastructure is constructed in              No additional water supply reticulation
a) in accordance with appropriate engineering          accordance with Section 6 of PSP6 Engineering              infrastructure is required. All water supply
   standards; and                                      Design Standards Water and Sewerage;                       infrastructure required for the site has previously
b) to minimise adverse environmental impacts.          AND                                                        been constructed in accordance with the
                                                                                                                  requirements of the existing site Development
                                                       S2.2                                                       Approval.
                                                       Erosion and sediment control measures are
                                                       designed and implemented in accordance with the
                                                       Institution of Engineers Australia (Queensland Division)
                                                       Soil Erosion and Sediment Control - Guidelines for
                                                       Queensland Construction Sites.
O3                                                     S3.1                                                       Complies with specific outcome.
Water supply infrastructure is proven to be suitable   No solution provided.                                      No additional water supply reticulation
for its use prior to Council accepting the dedicated                                                              infrastructure is required.
asset.
O4                                                     S4.1                                                       Complies with specific outcome.
Water supply infrastructure is provided with all       No solution provided.                                      No additional water supply infrastructure is
supporting technical documentation.                                                                               required.
O5                                                     S5.1                                                       Not applicable.
Where buildings or other structures are in proximity   The footing of any building or structure is located        No buildings are being developed in close
to Council s water supply infrastructure, provision    clear of the zone of influence but no closer than 1.5m     proximity to Council water supply reticulation
is made to protect the infrastructure from physical    (measured horizontally) from infrastructure                infrastructure.
damage and to allow ongoing maintenance by             including sewers, water mains and stormwater
Council.                                               structures;
                                                       AND

                                                       S5.2
                                                       A registered easement in favour of Council is              No easements are required.
                                                       created over all underground infrastructure located
                                                                                                                                                     Volume II: Code Responses

                                                                                                                                                     Viridian Noosa Project
                                                                                                                                                     Viridian Stage 3

Water Supply and Sewerage Reticulation Code                                                                                                          11 April 2006      Page 138

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.