Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Volume 2 - Code Responses · 132006.823

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                     COLUMN 1                                            COLUMN 2                                           ASSESSMENT
              SPECIFIC OUTCOMES                         PROBABLE SOLUTIONS (if code assessable)
                                                      in private property;
                                                      AND

                                                      S5.3
                                                      The width of the easement is the greater of 3m or    No easements are required.
                                                      the width of the zone of influence;
                                                      AND

                                                      S5.4
                                                      The easement is centred over the centreline of the   No easements are required.
                                                      infrastructure.
O6                                                    S6.1                                                 Not applicable.
Alignment of water supply infrastructure allows for   Infrastructure is designed and constructed on the    No additional water supply reticulation
easy access for the ongoing maintenance by Council.   preferred alignments in accordance Section 3 of      infrastructure is required.
                                                      PSP6 Engineering Design Standards Water and
                                                      Sewerage.
O7                                                    S7.1                                                 Not applicable.
Any alterations or repairs to infrastructure as a     Any alterations or repair to infrastructure as a     No additional water supply reticulation
result of the development are made at no cost to      result of the development are completed at the       infrastructure is required.
Council.                                              developer s expense.




                                                                                                                                            Volume II: Code Responses

                                                                                                                                            Viridian Noosa Project
                                                                                                                                            Viridian Stage 3

Water Supply and Sewerage Reticulation Code                                                                                                 11 April 2006     Page 139

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.