Council archive · source document
Volume 2 - Code Responses · 132006.823
18.2 Sewerage reticulation32
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIAL OUTCOMES PROBABLE SOLUTIONS (if code assessable)
Design and construction (sewer)
O8 S8.1 Complies with specific outcome.
Sewerage reticulation infrastructure Sewerage reticulation infrastructure is designed in No new Council sewage reticulation is required as
a) meets the needs of the users; accordance with Sections 4 and 5 of PSP6 part of this development.
b) is designed to be compatible with existing Engineering Design Standards Water and
infrastructure; and Sewerage. The development requires connection to existing
c) is designed using materials that are suitable of sewage reticulation. The development represents a
the use, durable, easy to maintain and cost small increase in EP over the previously adopted
effective, taking into account the whole of life scheme detailed in the existing Development
cycle cost and Council s maintenance inventory. Approval. Previously approved development was
415 EP and this scheme represents 509 EP.
The previous scheme was analysed by Council s
consultants and was shown that whilst a section of
the sewer system was over capacity, spare capacity
in the downstream system results in no
surcharging. Preliminary assessment of the
proposed development indicates that the levels of
service required by Council can be achieved with
no additional sewage reticulation infrastructure
being required. Council s consultants will be
commissioned to confirm the suitability of the
existing system.
O9 S9.1 Complies with probable solution.
Sewerage reticulation infrastructure is Sewerage reticulation infrastructure is constructed No additional sewage reticulation infrastructure is
constructed in accordance with Section 6 of PSP6 Engineering required. All sewage infrastructure required for the
a) in accordance with appropriate engineering Design Standards Water and Sewerage and As site has been previously constructed in accordance
32 Council may require Sewerage Headworks Contributions in accordance with PSP16.
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Water Supply and Sewerage Reticulation Code 11 April 2006 Page 140
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗