18.2     Sewerage reticulation32

                     COLUMN 1                                                       COLUMN 2                                        ASSESSMENT
               SPECIAL OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)
Design and construction (sewer)
O8                                                           S8.1                                                  Complies with specific outcome.
Sewerage reticulation infrastructure                         Sewerage reticulation infrastructure is designed in   No new Council sewage reticulation is required as
a) meets the needs of the users;                             accordance with Sections 4 and 5 of PSP6              part of this development.
b) is designed to be compatible with existing                Engineering Design Standards Water and
   infrastructure; and                                       Sewerage.                                             The development requires connection to existing
c) is designed using materials that are suitable of                                                                sewage reticulation. The development represents a
   the use, durable, easy to maintain and cost                                                                     small increase in EP over the previously adopted
   effective, taking into account the whole of life                                                                scheme detailed in the existing Development
   cycle cost and Council s maintenance inventory.                                                                 Approval. Previously approved development was
                                                                                                                   415 EP and this scheme represents 509 EP.

                                                                                                                   The previous scheme was analysed by Council s
                                                                                                                   consultants and was shown that whilst a section of
                                                                                                                   the sewer system was over capacity, spare capacity
                                                                                                                   in the downstream system results in no
                                                                                                                   surcharging. Preliminary assessment of the
                                                                                                                   proposed development indicates that the levels of
                                                                                                                   service required by Council can be achieved with
                                                                                                                   no additional sewage reticulation infrastructure
                                                                                                                   being required. Council s consultants will be
                                                                                                                   commissioned to confirm the suitability of the
                                                                                                                   existing system.
O9                                                           S9.1                                                  Complies with probable solution.
Sewerage reticulation infrastructure is                      Sewerage reticulation infrastructure is constructed   No additional sewage reticulation infrastructure is
constructed                                                  in accordance with Section 6 of PSP6 Engineering      required. All sewage infrastructure required for the
a) in accordance with appropriate engineering                Design Standards Water and Sewerage and As            site has been previously constructed in accordance

32 Council may require Sewerage Headworks Contributions in accordance with PSP16.


                                                                                                                                                     Volume II: Code Responses

                                                                                                                                                     Viridian Noosa Project
                                                                                                                                                     Viridian Stage 3

Water Supply and Sewerage Reticulation Code                                                                                                          11 April 2006     Page 140

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.