Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

 

 

 

 

 

 

 

 

 

f STEVE RACKEMANN. KNOBEL CONSULTING PTY LID
Proposed Duplex Stormwater Management Plan
B Lot 403 RP48112 - 51 Elanda Street . Project No: K1595
Sunshine Beach
n 3.1.1 Key Pollutants
™ In accordance with Table 13.1.C (GCCC Draft WSUD Guidelines, 2007) the following key pollutants
= have been identified for the Construction Phase of this development.
Table 2: Key Pollutants, Construction Phase
‘Pollutant « Sources a | :
” Litter Paper, construction packaging, food packaging, cement bags,
vs material off cuts.
Sediment Exposed soils and stockpiles during earthworks and building works,
Hydrocarbons Fuel and oil spills, leaks from construction equipment and temporary
ra car park areas.
. . Cement slurry, asphait primer, solvents, cleaning agents, and wash
= Toxic Materials waters (eg, from tile works).
Acids or Alkaline . .
substances Acid sulphate soils, cement slurry and wash waters.
3.1.2 Performance Criteria
In accordance with Table 13.1.A (GCCC Draft WSUD Guidelines, 2007) the following site discharge

 

pollutant criteria have been identified during the construction phase of the development.

Table 3: Construction Phase, Water Quality Performance Criteria

 

 

 

 

 

 

 

 

Pollutant Ciiteia

Total Suspended Solids 90th Sile <5Omg/L

pH 6.5 -9.0

Dissolved Oxygen 90" %ile >80% saturation or 6mg/L

Hydrocarbons No visible sheen on receiving waters

litter No visible litter washed from site,

Cations and Anions np cable to Development, Sulphate Soll Management Plan (If

 

 

 

3.1.3 Sediment and Erosion Controls
Sediment and erosion control devices G&EC) employed on the site shall be designed and
constructed in accordance with the Institution of Engineers, Soi Erosion and Sediment Control
Guidelines (IESESC) as shown on Knobel Consulting Pty Ltd drawing, Sediment and Erosion Control
Layout Plan & Details Sheet (Ref: K1595/SE001/A) included as Appendix E.

During construction, all areas of exposed soils allowing dust generation are to be suitably treated.
Treatments will include covering the soil and watering. Road accesses are to be regularly cleaned
to prevent the transmission of soil on vehicle wheels and eliminate any build up of typical road dirt
and tyre dusts from delivery vehicles.

 

co co OoOlLUrllhlUmelhlUn eC Cue ee le) lai

 

K1595-0006 § June 2009 Page 6 of &

 

 

a)

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.