Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
f STEVE RACKEMANN. KNOBEL CONSULTING PTY LID Proposed Duplex Stormwater Management Plan B Lot 403 RP48112 - 51 Elanda Street . Project No: K1595 Sunshine Beach n 3.1.1 Key Pollutants ™ In accordance with Table 13.1.C (GCCC Draft WSUD Guidelines, 2007) the following key pollutants = have been identified for the Construction Phase of this development. Table 2: Key Pollutants, Construction Phase ‘Pollutant « Sources a | : ” Litter Paper, construction packaging, food packaging, cement bags, vs material off cuts. Sediment Exposed soils and stockpiles during earthworks and building works, Hydrocarbons Fuel and oil spills, leaks from construction equipment and temporary ra car park areas. . . Cement slurry, asphait primer, solvents, cleaning agents, and wash = Toxic Materials waters (eg, from tile works). Acids or Alkaline . . substances Acid sulphate soils, cement slurry and wash waters. 3.1.2 Performance Criteria In accordance with Table 13.1.A (GCCC Draft WSUD Guidelines, 2007) the following site discharge pollutant criteria have been identified during the construction phase of the development. Table 3: Construction Phase, Water Quality Performance Criteria Pollutant Ciiteia Total Suspended Solids 90th Sile <5Omg/L pH 6.5 -9.0 Dissolved Oxygen 90" %ile >80% saturation or 6mg/L Hydrocarbons No visible sheen on receiving waters litter No visible litter washed from site, Cations and Anions np cable to Development, Sulphate Soll Management Plan (If 3.1.3 Sediment and Erosion Controls Sediment and erosion control devices G&EC) employed on the site shall be designed and constructed in accordance with the Institution of Engineers, Soi Erosion and Sediment Control Guidelines (IESESC) as shown on Knobel Consulting Pty Ltd drawing, Sediment and Erosion Control Layout Plan & Details Sheet (Ref: K1595/SE001/A) included as Appendix E. During construction, all areas of exposed soils allowing dust generation are to be suitably treated. Treatments will include covering the soil and watering. Road accesses are to be regularly cleaned to prevent the transmission of soil on vehicle wheels and eliminate any build up of typical road dirt and tyre dusts from delivery vehicles. co co OoOlLUrllhlUmelhlUn eC Cue ee le) lai K1595-0006 § June 2009 Page 6 of & a)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.