2022-07-21 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 21 JULY 2022
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
a. 7kL of storage for roofwater capture and reuse. The storage tank is to receive
only roofwater runoff and is to be provided with a solid lid to prevent the inflow
of surface runoff. A backflow prevention device is to be fitted to restrict the
backflow of water in the detention tank into the roofwater storage;
b. Captured roofwater is to be plumbed to communal non-potable fixtures,
including bin washdown and landscape irrigation;
c. Stormwater pits receiving surface runoff are to be provided with litter-
baskets; and
d. An underground detention tank is to be provided within the site to ensure site
discharges achieve non-worsening for the range of durations relevant to the
downstream drainage network.
30. In conjunction with the development application for Operational Works, revised
detention tank design calculations and documentation is to be provided which
identifies all assumptions and the methodology applied in deriving the tank design,
and which is based on the recommendations of Australian Rainfall and Runoff
2019 and QUDM 2017. Ensemble temporal patterns are to be utilised for the
analysis as well as the current rainfall intensities recommended by Bureau of
Meteorology. The detention tank is to achieve non-worsening for the range of
durations and recurrence intervals relevant to the downstream drainage network.
Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
Services
31. Reticulated electricity and telecommunication services must be provided to the
development in accordance with the standards and requirements of the relevant
service provider.
32. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
33. Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater) which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
34. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
35. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
36. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
37. All earthworks and associated retaining structures/batters must be undertaken in
Page 12 of 25