PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 17 JUNE 2014
35. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Additional water meters must be installed for each title
of a community title or sub-lease scheme. Meters must be Unitywater approved,
installed in accordance with Unitywater requirements and remain accessible at all
times for reading and maintenance purposes.
36. Water meters must be located on alternative boundaries to electrical pillars.
37. Buildings and other structures must maintain a minimum clearance of 1.5 meters
from Unitywater sewer mains, and 1.0 meter from a sewer manhole chamber or
sewer inspection opening.
38. The level of the existing sewer manholes must be adjusted to suit the proposed
finished surface levels. Work must be undertaken by Unitywater at the applicant’s
cost or by the applicant’s private contractors following submission to Council of an
Operational Works application and approval of the application.
39. Easements of between 3 and 10 metres must be provided over all Unitywater sewers
located within property boundaries in accordance with the SEQ standards.
Easements shall be centred over the pipe. Easement terms shall be the most current
registered dealing held by the Department of Natural Resources & Mines and shall
not be altered or amended.
40. Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 meters from Unitywater water supply and sewerage infrastructure.
41. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature, and
suitable approved varieties.
42. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
Development Compliance Inspection
1. Prior to the commencement of the use, please contact Council's Development Audit
& Response Unit to arrange a Development Compliance Inspection.
Infrastructure Charges
2. This Development Permit will trigger an “Adopted Infrastructure Charge Notice” (if
applicable) to be issued in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Qualified persons – Landscaping
3. For the purpose of preparing a Landscape Plan, a qualified person is considered to
be a landscape architect, landscape designer and/or horticulturist with a minimum of
3 years current experience in the field of landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
6855.
Page 11 of 112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.