PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 17 JUNE 2014
(iii) analytical justification that demonstrates design flows can enter any
proposed underground drainage system under appropriate blockage
conditions.
(iv) potential effects of flows in excess of the design flow including the
consequences of the Probable Maximum Flood.
(v) allowances made in the design for debris blockages of the inlet.
(vi) potential effects of debris blockages in excess of that allowed for in the
design.
(vii) an easement for drainage purposes to be registered against the title of the
property in favour of Council over the land and drainage system which
conveys external flows through the site. The easement must be granted at
no cost to council.
(e) the use of gravity stormwater drainage and not surcharge pits.
*(Refer to Advisory Note)
Stormwater Quality Management
36. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the latest
version of the Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland, and must include in particular:
(a) stormwater quality treatment devices of a size and location generally in
accordance with those shown in section 5 of the of the Site Based Stormwater
Management Plan listed in this Decision Notice.
(b) bioretention devices which:
(i) are designed generally in accordance with IPWEQA Standard Drawing No.
WSUD-001.
(ii) incorporate a coarse sediment forebay (in addition to the required filter
media surface area), which is sized in accordance with the latest version of
the Water Sensitive Urban Design Technical Design Guidelines for South
East Queensland and designed generally in accordance with IPWEQA
Standard Drawing No. WSUD-005.
(iii) have safe, unobstructed and all weather access from the road frontage for
maintenance purposes, particularly for the coarse sediment forebay.
(iv) are provided with a high flow bypass to ensure that flows which exceed the
treatment capacity of the device are bypassed in order to avoid damaging
of the filter media or subjecting the filter media to excessive sediment
loads.
(v) are provided with a free-draining outlet from the sub-soil drainage system.
(vi) treat stormwater from all developed catchments (including roof and carpark
catchments) prior to discharge.
37. Permanent educational signage must be erected to educate the customers to the
development about the function of the bioretention device(s). The dimensions, standard,
presentation and location of the educational signage must be in accordance with an
Operational Works approval. *(Refer to Advisory Note)
Page 40 of 112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.