Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

EASTERN BEACHES FORESHORE RESERVES MANAGEMENT PLAN - COMMUNITY CONSULTATION OVERVIEW AND PROPOSED CHANGES (Referred from Planning and Environment Committee dated 8 August 2023 - Item 5.1) · Attachment 2 EBFRMP 2023 Draft - tracked changes

of 107

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 Action                                                        Responsible          Due date and
                                                               partyResponsibilit   Priority status
                                                               y
 9.1. Update and implement ecological restoration plans        Environmental        Immediate
 for all EBFRs.6.1. Manage the EBFRs as natural areas          Services             Continuing2023-
 as part of a nature-based approach to mitigating climate      Environmental        24
 change and coastal hazards risks.                             Services             ongoing
                                                               Infrastructure
                                                               Services

 9.2. Provide general community information about the          Climate Change       Immediate2022-
 values of vegetated foreshores and natural processes for      Environmental        23
 community climate change resilience online, on-reserve        Services Council     ongoing
 and nearby.                                                   staff lead by
 6.2. Incorporate coastal climate change considerations        Climate Change
 into foreshore reserve planning and management.               team

 9.3. Experiment with accelerated assisted natural bush        Environmental        Immediate
 regeneration, vegetation rehabilitation and dune              Services             Continuing2022-
 rebuilding, especially at the seaward edge of dunes and       Bushcare             23
 foreshores.                                                   groupsClimate        ongoing
  6.3. Monitor the long-term health and stability of coastal   Change Team
 landforms and vegetation extent through the Coastal           Environmental
 Monitoring Plan. Map the extent of EBFR vegetation            Services
 every two years.
 9.4. Develop design standards for beach accesses and          Infrastructure       Immediate
 coastal community infrastructure components.                  ServicesEnviron      Continuing 2023-
 6.4. Conduct post-weather event assessment of the             mental Services      24
 EBFRs.                                                        Infrastructure       ongoing
                                                               Services
 9.5. Allocate emergency contingent ecology funds and          Environmental        Medium
 resources as part of annual budget process to more            Services             2023-24
 readily deploy bush regeneration and recovery activities      Environmental        ongoing
 after severe weather and disaster events.                     Services
 6.5. Explore allocation of emergency contingent ecology
 funds and resources as part of annual budget process to
 more readily deploy bush regeneration and recovery
 activities after severe weather and disaster events.
 9.6. Develop an overarching beach access plan and             Environmental        Medium2023-24
 maintenance plan for beach accesses and coastal               Services             ongoing
 community infrastructure components.                          Infrastructure
 6.6. Experiment with accelerated assisted natural bush        ServicesEnviron
 regeneration, vegetation rehabilitation and dune              mental Services
 rebuilding, especially at the seaward edge.                   Bushcare groups
 9.7. Conduct a review of existing beach accesses,             Environmental        Long
 viewing platforms, signage, fencing, seat and other           Services
 community coastal infrastructure, in line with Noosa’s        Infrastructure
 Design Principles.                                            Services

 Review elements include; classification, location, use,
 construction and maintenance, environmental impacts
 and defects, overuse and new or moved beach accesses
 where needed.


Eastern Beaches Foreshore Reserves Management Plan 2023                                        Page 30
Log in to download the original file

Attachment 2 EBFRMP 2023 Draft - tracked changes.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.