Skip to the record
Beware of cheap imitations.

Original source · versioned page text

EASTERN BEACHES FORESHORE RESERVES MANAGEMENT PLAN - COMMUNITY CONSULTATION OVERVIEW AND PROPOSED CHANGES (Referred from Planning and Environment Committee dated 8 August 2023 - Item 5.1) · Attachment 2 EBFRMP 2023 Draft - tracked changes

of 107

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Measures

 Measure                                                    Responsibility    Due date and
                                                                              statusTimeframe

 Conduct a desktop review of the extent of EBFR             Environmental     Collected 21-22
 vegetation every two years, using remote sensing data      Services
                                                                              Due 23-24Two
 collected under the Coastal Monitoring Plan. Vegetation
                                                            Climate           yearly
 % cover of available land continues to increase.
                                                            Change

 Conduct an annual audit to ensure climate change           Environmental     Immediate
 elements are incorporated into new or reviewed             Services
                                                                              Ongoing
 management planning and works, aiming for 100%
 compliance.




After-fire bush regeneration at Peregian Beach – a post-extreme weather event rapid
response opportunity

After the September 2019 fires at Peregian Beach, an area on the western side of David Low Way
and backing onto national park was badly affected by fire. In places most of the canopy trees were
destroyed, increasing sunlight, and making the area vulnerable to roadside weed grasses. The
Peregian Beach Bushland Care group requested Council allocate a small budget to employ a
contractor to treat the weed grasses. The budget was eventually allocated but the weed grasses
had established and expanded, and the originally proposed budget was no longer adequate.

A post-event rapid regeneration response budget would will allow flexibility to respond to a range of
extreme weather impacts, including fire, that would be cost-effective and help prevent degradation.




Eastern Beaches Foreshore Reserves Management Plan 2023                                      Page 31
Log in to download the original file

Attachment 2 EBFRMP 2023 Draft - tracked changes.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.