Original source · versioned page text
EASTERN BEACHES FORESHORE RESERVES MANAGEMENT PLAN - COMMUNITY CONSULTATION OVERVIEW AND PROPOSED CHANGES (Referred from Planning and Environment Committee dated 8 August 2023 - Item 5.1) · Attachment 2 EBFRMP 2023 Draft - tracked changes
Plans and drawings: the text below has words only, no drawings.
Measures
Measure Responsibility Due date and
statusTimeframe
Conduct a desktop review of the extent of EBFR Environmental Collected 21-22
vegetation every two years, using remote sensing data Services
Due 23-24Two
collected under the Coastal Monitoring Plan. Vegetation
Climate yearly
% cover of available land continues to increase.
Change
Conduct an annual audit to ensure climate change Environmental Immediate
elements are incorporated into new or reviewed Services
Ongoing
management planning and works, aiming for 100%
compliance.
After-fire bush regeneration at Peregian Beach – a post-extreme weather event rapid
response opportunity
After the September 2019 fires at Peregian Beach, an area on the western side of David Low Way
and backing onto national park was badly affected by fire. In places most of the canopy trees were
destroyed, increasing sunlight, and making the area vulnerable to roadside weed grasses. The
Peregian Beach Bushland Care group requested Council allocate a small budget to employ a
contractor to treat the weed grasses. The budget was eventually allocated but the weed grasses
had established and expanded, and the originally proposed budget was no longer adequate.
A post-event rapid regeneration response budget would will allow flexibility to respond to a range of
extreme weather impacts, including fire, that would be cost-effective and help prevent degradation.
Eastern Beaches Foreshore Reserves Management Plan 2023 Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.