Attachment 1 - Current Approval for MCU
Attached to the e-mail 132007.12.06 Application to Change Development Approval.
132007.12.4
38. Vehicular access to the site from Goodchap Street and car parking shall be generally in
accordance with Middap Ditchfiled Pty Ltd Drawings: -
38.1. Stage A – 0715 WD 01.1, 0427 DA01E, 0427 DA02E, 0427 DA03E, 0427 DA04E,
except as modified herein, the multilevel car park as shown on 0427 DA01E, 0427
DA02E, 0427 DA03E, 0427 DA04E.
38.2. Stage B - 0427 DA01E, 0427 DA02E, 0427 DA03E, 0427 DA04E, 0427 DA10E,
0427 DA11E and 0427 DA12E, except as modified herein.
39. All carparking shall be kept, maintained and line-marked in a condition fit for use.
40. All staff carpark spaces shall be clearly defined by line marking each space with the
words “Staff Parking Only” and by sign posting each space with a similar wording.
Pathway Lighting
41. The existing pathway between the two existing lots shall have lighting installed from
Goodchap Street to the rear boundary of Lot 4. This lighting shall have a high energy
efficient rating to the reasonable satisfaction of Council and be designed to meet
appropriate safety standards and not to adversely impact residences in the area.
Vegetation Protection & Preservation
42. Vehicular pavements within the drip zone of any of the existing trees on site to be
retained shall be designed as a pervious pavement (such as grass paving cells or
similar), as this will allow water that falls on this surface to penetrate to the trees root
system. The pavement shall be constructed so as not to damage the tree or their root
system and in this regard temporary fencing shall be provided around the trees during
construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent
of the pervious pavement and the temporary fencing prior to obtaining a Development
Permit for Operational Works.
Frontage Works
43. Tree planting is required to the Goodchap Street frontage of Proposed Lot 5 in
accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.
Roof Water & Stormwater Drainage
44. Roof runoff from any new building shall be directed to a rainwater storage system or tank
(minimum storage the greater of 5000 litres or 15 litres/m 2 of roof area ) that is installed
to ensure water from the tank is used for external uses (such as watering gardens,
irrigation, ornamental ponds, water features, outdoor cleaning, etc) and for use in
flushing of toilets internal to the building. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code (QDC), Part 25 –
Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the
plans submitted for Building Works / Operational W orks approval and any overflow shall
be directed to an approved discharge point.
45. All stormwater drainage (including roof water overflow from the rainwater storage
system) shall be collected and discharged so there is no net increase in stormwater
runoff from the site
46. A Stormwater Management Plan shall be submitted to Council in conjunction with an
operational works application to demonstrate how water quality and quantity objectives
are to be met. This Management Plan shall set the objectives and include a plan
indicating location and sizing of the devices prosed. The operational works application
shall be in accrordance with this plan and buildings shall be modified if required to
accommodate the necessary treatment infrastructure.
PD-DA-FM383/5-09/08/2010 Page 6 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1 - Current Approval for MCU.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.