Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed in the tables below. The plans must be amended to
incorporate the amendments listed within the table below and resubmitted to Council
prior ta the issue of any Development Permit for Operational Works*
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date |
a + <= , . au —|
:CD2.01C C Basement Plan prepared by Arkos : 20.02.2025
Architects
Amendments ‘The plan is to be amended to accommodate the waste collection
_and servicing to occur on site and consistent with engineering
requirements outlined in condition 61.
. Additional information in relation to the ‘end of trip’ facilities are
to be included on the plan.
| A total of 29 car parking spaces are to be shown for the Short
_ term accommodation use on either Basement Plan or Ground
floor pian.
CD 2.02 B B Ground Floor Plan prepared by Arkos 20.02.2025
Architects
Ae - 2555 The plan is to be amended to demonstrate that a minimum of 1.0
= ‘metre width of soft landscaping can be provided to all street
frontages particularly around proposed urban infrastructure in
Albert Street.
| The plan is to demonstrate a minimum of 375 square metres
of landscaping is provided on site excluding outdoor dining and
| paved areas. Provide an updated calculation which separates
all landscaping areas individually to comprise 375 square
_ metres of landscaping.
| The plan is to amend the number of ‘Tide’ structures to
maximum of 5, with each structure to provide shade to a seat,
| with the structures to be built within the site boundary.
Carparks 2 - 12 are to be amended to accommodate
landscaping infrastructure in accordance with the Landscaping
' Werks conditions of this approval.
The ground floor plan is to accommodate on site refuse collection
/ in accordance with the engineering requirements stipulated in
condition 61
CB 2.03. C C Level 01 Plan prepared by Arkos 26.02.2025
Architects
CD 2.04C C Level 02 Plan prepared by Arkos 26.02.2025
Architects
ENY)
aw Noy
S Z
a\ Ye /§
< ~
C &
Varooew
4
Document Set ID: 23711366
Version: 1, Version Date: 30/04/2025 Page 85 of 182See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.