Council archive · source document
Meeting papers
Very large file (21.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 90, section 1. The text section number identifies this passage in the reader.
Document Set ID: 23711366
Page 90 of 182
Version: 1, Version Date: 30/04/2025
43. Service vehicle parking. manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval and
must include in particular.
a. 1MRV spaces: and
b. regular access for a Small Rigid Vehicle, Medium Rigid Vehicle, Heavy Rigid
Vehicle and Refuse Collection Vehicle (Side Loader Senes V (6x4)} — service
vehicles must be able to enter the site from Albert Street, manoeuvre through the
development and exit onto Thomas Street without exiting the designated “concrete
dnveway".
59. All earthworks and associated retaining structures/batters, both above and below
ground, both temporary and permanent, must be undertaken in accordance with an
Operational Works approval, be generally in accordance with RECOR's Bulk Earthworks
Layout Plan (020, Rev. C) dated 20 December 2024 and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must ensure that adjacent properties and associated
infrastructure is not disadvantaged by additional flows or adverse impacts on the
functionality of access driveways and carparks.
61. Prior to Council issuing a Development Permit for Operational Works, an amended
Waste Management Plan must be submitted to council for approval that allows for all
waste collection and servicing to occur on site. The amended Waste Management Plan
must be prepared by a suitably qualified person who is experienced in waste
management and includes in particular:
a. Onsite collection of refuse/recycling should be done using 1100Itr low noise waste
containers. Services to be done several times weekly to reduce the actual bin
numbers on site: and
b. provision for on-site servicing by a Refuse Collection Vehicle (Dennis Eagle Elite
2 6x4 with rear lift configuration) - the Refuse Collection Vehicle must be able to
enter the site from Albert Street, service the site, and exit on Thomas Street, and
c. compliance with The Noosa Plan 2020 - Waste Management Code and PSP9
Waste Management.
d. the Refuse Collection Vehicle (Dennis Eagle Elite 2 6x4 with rear lift configuration)
must enter via Albert Street and exit via Thomas Street.
62. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an
impervious area, within the site, correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties. A bin wash area
is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
irap. The drain outlet must be designed to prevent storm water entry to the sewerage
system.
63. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection {Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
64. Storage, disposal and management of solid, liquid and vegetative waste is conducted in
a safe and ecologically sustainable manner without environmental nuisance. In this
regard, vegetated waste must be disposed of via a green waste bin or at a local transfer
station.
4 ENVIE
ZN Ux
s 2D
= ES oO
= g
w is =
ss >
. &
Car coowS
6
Document Set ID: 23711366
Version: 1, Version Date: 30/04/2025 Page 90 of 182See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.