Skip to the record
The gold standard in government transparency.

Council archive · source document

Meeting papers

of 183

Text shows just the words. Original shows the document exactly as it was published.

Very large file (21.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 90, section 1. The text section number identifies this passage in the reader.

Document Set ID: 23711366
                                       Page 90 of 182
Version: 1, Version Date: 30/04/2025

43.  Service vehicle parking. manoeuvring and standing spaces must be provided on the site.
                       The works must be undertaken in accordance with an Operational Works approval and
                       must include in particular.
                       a.    1MRV spaces: and
                       b.    regular access for a Small Rigid Vehicle, Medium Rigid Vehicle, Heavy Rigid
                             Vehicle and Refuse Collection Vehicle (Side Loader Senes V (6x4)} — service
                             vehicles must be able to enter the site from Albert Street, manoeuvre through the
                             development and exit onto Thomas Street without exiting the designated “concrete
                             dnveway".
                  59.  All earthworks and associated retaining structures/batters, both above and below
                       ground, both temporary and permanent, must be undertaken in accordance with an
                       Operational Works approval, be generally in accordance with RECOR's Bulk Earthworks
                       Layout Plan (020, Rev. C) dated 20 December 2024 and contained entirely within the
                       subject site unless written permission from the respective landowner(s) is provided to
                       Council.   All earthworks must ensure that adjacent properties and associated
                       infrastructure is not disadvantaged by additional flows or adverse impacts on the
                       functionality of access driveways and carparks.
                  61.   Prior to Council issuing a Development Permit for Operational Works, an amended
                        Waste Management Plan must be submitted to council for approval that allows for all
                        waste collection and servicing to occur on site. The amended Waste Management Plan
                        must be prepared by a suitably qualified person who is experienced in waste
                        management and includes in particular:
                        a.   Onsite collection of refuse/recycling should be done using 1100Itr low noise waste
                             containers. Services to be done several times weekly to reduce the actual bin
                             numbers on site: and

                        b.    provision for on-site servicing by a Refuse Collection Vehicle (Dennis Eagle Elite
                              2 6x4 with rear lift configuration) - the Refuse Collection Vehicle must be able to
                              enter the site from Albert Street, service the site, and exit on Thomas Street, and
                         c.   compliance with The Noosa Plan 2020 - Waste Management Code and PSP9
                              Waste Management.
                         d.   the Refuse Collection Vehicle (Dennis Eagle Elite 2 6x4 with rear lift configuration)
                              must enter via Albert Street and exit via Thomas Street.
                   62.   The developer must provide waste storage and disposal facilities in accordance with
                         Planning Scheme Policy 9 - Waste Management. The facilities must include an
                         impervious area, within the site, correctly sized for all refuse and recycling containers
                         and suitably screened from public places and neighbouring properties. A bin wash area
                         is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
                         irap. The drain outlet must be designed to prevent storm water entry to the sewerage
                         system.
                    63.  Refuse containers must be provided in accordance with the requirements of the
                         Environmental Protection {Interim Waste) Regulation 1996 and (Waste Management)
                         Regulation 2000, for the storage and collection of refuse.
                    64.  Storage, disposal and management of solid, liquid and vegetative waste is conducted in
                         a safe and ecologically sustainable manner without environmental nuisance. In this
                         regard, vegetated waste must be disposed of via a green waste bin or at a local transfer
                         station.

            4 ENVIE
        ZN         Ux
      s               2D
      =         ES     oO
      =                g
       w    is        =
       ss             >
        .           &
         Car coowS
                                                                                                                               6
Document Set ID: 23711366
Version: 1, Version Date: 30/04/2025                                                                               Page 90 of 182
Log in to download the original file

a82ebc321e.pdf · 21.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.