Approved Plan - Landscape Specification prepared by URBIS - OPW24/0110

of 128

Page text read automatically using OCR, there may be inaccuracies

Levels
Ensure there is no more than 2mm different in height between adjoining pavement segments, other adjoining
pavements, top of kerbs or pit covers (unless specified otherwise).

Spot levels take precedence over contour lines and existing ground profile lines.

Concrete Joints
All joints to be laid out as indicated on the construction drawings. If the location and type of construction
joints are not shown on the drawings, submit proposed location and detail of construction joints to the
Landscape Architect for approval prior to the start of formwork placement. Periods of stoppage in concrete of
3/4 hour or more are deemed to be construction joints.
Ensure that joint widths between pavers at dowelled construction joints are equal to the underlying concrete
pavement joint widths. The concrete base slab should not be designed solely as a jointed reinforced
concrete pavement (JRCP) but must be designed and detailed to avoid differential strains between the
pavers and the concrete slab. Pavers to be laid immediately following construction of concrete base to avoid
shrinkage of slab.

Expansion joints
All visible expansion joints to be 10mm wide zipped polyethylene foam (e.g. Abelflex) sealed with an
approved coloured sealant (e.g. Sikaflex or equivalent). Colour to match the lightest coloured adjacent
pavement. Expansion joints in structural slab underneath (both basement and single slab) are to be carried
through to the surface in the same dimensions.

Control joints
To be 20mm deep cut saws. Make the joint straight and true, and free from blemishes impermissible for its
surface finish class.


9.2.        TIMBER WORKS
Sawn / Dressed Timber
All timber shall be hardwood to AS 2082 to the stress grade nominated. All timber is to be ‘appearance’ or
dressed grade. All hardwood timber specified is to be Durability 2 class except where in contract with ground
surface where it shall be Durability Class 1. All sawn timber to be branded as complying with the
requirements of AHQC (Australian Hardwood Quality Council).

Timber Connections
Structural fasteners shall be located in sound timber avoiding timber defects. Fasteners shall be installed in
accordance with Manufacturer’s instructions. All bolts, nuts, washers, nail plates and brackets to be hot
dipped galvanised to AS 1650.

Additionally, bolt shanks and washers bearing against timber shall be protected with Dulux Amercoat 385
applied in accordance with the manufacturers specification and properly cured before installation. Bolt holes
to be 10% greater than the nominal bolt sizes. Position bolts to facilitate tightening. Coat all bolt shanks with
CN Emulsion before installation. Bolts to be snug tight (do not over tighten). Washers to be placed under all
bolt heads (except where cuphead bolts specified) and nuts.

Timber Quality
Timber shall be graded and audited under the Australian Hardwood Quality Control Program.

At the time of grading, the bottom and sides of the plank shall conform to Structural Grade No. 2 (for Forest
Red Gum Structural Grade 1) (AS 2082)

Preservative Treatment



URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   13

Log in to download the original (Approved Plan - Landscape Specification prepared by URBIS - OPW24_0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.