                                                                                                       MCU16/0133


                                        ii.   Dispute resolution procedures.
                      15.     Any changes to the details associated with the supervising RPEQ or Principal
                              Contractor during construction, must be notified to council in writing within five
                              business days of the change occurring.
                      16.     Any alteration to existing services or conflict between the development and an
                              existing or proposed service must be referred to the relevant service authority for
                              determination prior to commencement of works.
                              DURING CONSTRUCTION
                              General
                      17.     The developer must meet any costs to repair damage to any Council asset during
                              construction, where damage is a result of the development works. Damage to
                              assets must be repaired immediately where it creates a hazard to the community.
                              In circumstances where the damage does not create a hazard to the community, it
                              must be repaired immediately on completion of the works associated with the
                              development.
                      18.     All works must be supervised by a Registered Professional Engineer of
                              Queensland (RPEQ) who is independent of the Developer and Principal
                              Contractor, and they must certify that all works conform to the Operational Works
                              permit. Where municipal works are involved (eg pathway), such confirmation must
                              be submitted for the respective hold points prior to any site inspection by Council
                              Officers.
                      19.     All works must be constructed and work procedure undertaken in accordance with:
                              a.       The approved plans and conditions detailed in this Decision Notice.
                              b.       All relevant Noosa Council Planning Scheme Policies, standard drawings,
                                       standard specifications and guidelines, particularly PSP 5 – Engineering
                                       Design Standards – Roads, Drainage and Earthworks.
                              c.       The latest version of the Healthy Waterways document “Water Sensitive
                                       Urban Design Technical Design Guidelines for South East Queensland” for
                                       all water quality devices to be constructed on site.
                              Driveways
                      20.     Driveway crossovers must be designed and constructed generally in accordance
                              with the approved plans and in accordance with IPWEA standard drawing RS- 051
                              and must have levels and grades that match the levels, width (2m) and the grades
                              of the existing concrete footpath without creating trip hazards.
                      21.     The following must be complied with during the construction of the required
                              crossovers/driveways:
                              a.       The driveway width must not exceed 6m at the front boundary line and 9m at
                                       the kerb line.
                              b.       The driveway surfacing must consist of either an approved hot mixed
                                       asphaltic concrete or patterned/plain concrete and must have a slip resistant
                                       surface.
                              c.       The driveway must be constructed so as not to concentrate stormwater
                                       runoff or ponding onto other properties and/or the road verge.




                                                                                                             Page 9 of 21


Document Set ID: 20278602
Version: 1, Version Date: 22/02/2017                                                                Print Date: 22 February 2017, 1:04 PM

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

HRP18103.L02.002_Change application.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.