Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
A15 – Water Sensitive Design Code
The below code response has been prepared by Cardno HRP and Cardno Engineering. In addition to the Town Planning Report, reference should be made to the
Engineering Report (Appendix E) in reading this code response.
Specific Outcome Probable Solution Response
Water reuse
O1 Development uses a combination of S1.1 Development complies with the water quality standards in R1.1 Complies
detention and retention systems to capture Table 2 of the SEQ Regional Plan Implementation Guideline Both detention and retention devices are to be provided as outlined
run-off from areas on the site; No. 7 for Water Sensitive Urban Design; in the Stormwater Management Plan included as Appendix D in the
AND Engineering Report (Appendix E to the Town Planning Report).
O2 Water storage devices must have sufficient S2.1 No solution provided. R2 Alternative Solution (as no Probable Solution is provided)
capacity having regard to local rainfall Water storage devices have been sized to detain catchment runoff
pattern and the catchment area of roof or resulting from storms up to and including the 100 year ARI event.
other hard standing surface;
AND
O3 Captured water is utilised for all non-potable S3.1 Captured water is plumbed to be available for all external R3.1 Will Comply
uses on site; uses including gardening, irrigation, ponds, filling swimming A 300kL rainwater tank is currently proposed for re-use purposes.
AND pools and outdoor cleaning, as well as all ground floor toilet This will be confirmed in the detail design phase of the project.
cisterns and washing machine cold taps;
AND
S3.2 Where the captured water is used for toilet flushing and/or R3.2 Can Comply
laundry use, an automatic or manual interchange device that
allows alternate use of captured water or the reticulated water
supply is installed to ensure that there is a continual supply of
water for sanitary flushing and laundry use.
O4 On-site detention does not adversely impact S4.1 No solution provided. R4 Alternative Solution (as no Probable Solution is provided)
on water requirements downstream of the The on-site detention/retention systems proposed will maintain
site where the water is required to sustain existing environmental flows.
the ecology and hydrology of downstream
systems (environmental flows);
AND
O5 Within the Shire Business Centre site, as S5.1 No solution provided. R5 Alternative Solution (as no Probable Solution is provided)
shown on Map SBC, on-site detention Refer to Appendix E – Engineering Report.
measures are contained within the
developed areas of the site, clear of
drainage lines and Open Space Precincts.
Run-off treatment
O6 Run-off that leaves the site is treated so as S6.1 Development complies with the water quality standards in R6.1-7.1 Complies
not to adversely impact on the ecology and Table 2 of the SEQ Regional Plan Implementation Guideline Runoff treatment will be provided to satisfy the objectives of the
hydrology of downstream environmental No. 7 for Water Sensitive Urban Design. State Planning Policy and the requirements of Noosa Shire Council.
flows;
December 2014 Cardno HRP A103
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.