Skip to the record
Accept no substitutions.

Original source · versioned page text

MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance

of 239

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 185, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                 Town Planning Report
                                                                                                  28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive



 Specific Outcome                                           Probable Solution                                                       Response
         AND                                                                                                                        Refer to Appendix E – Engineering Report.

 O7      Within the Shire Business Centre site, as         S7.1
         shown on Map SBC—
         a) run-off treatment occurs within the site ;
         and
         b) drainage lines are only used for final
         polishing of run-off.
 Town water supply connections
 O8      Backflow devices or similar systems ensure        S8.1     A suitable backflow prevention device is installed to protect   R8.1 Will Comply
         water reuse facilities have no impact on the               the potable water within the reticulated water supply in        Compliance with O8 will be achieved and will be included in the
         quality of the town mains water.                           accordance with AS/NZS 3500:2003 Plumbing and Drainage.         detailed design phase of the project.
 Use of natural treatments and systems
 O9      Natural treatment strategies, including grass     S9.1     Development complies with the water quality standards in        R9.1-10.1 Alternative Solution
         swales and bio-retention systems,                          Table 2 of the SEQ Regional Plan Implementation Guideline       Compliance with O9 will be achieved in accordance with the
         vegetated filtration strips and gross pollutant            No. 7 for Water Sensitive Urban Design.                         measures outlined in Appendix D of the Engineering Report.
         traps, are used wherever practicable;                                                                                      (Appendix E to the Town Planning Report).
         AND
 O10     Within the Shire Business Centre, as shown        S10.1
         on Map SBC— where necessary, drainage
         lines are ecologically enhanced to ensure
         that the water quality polishing functions are
         of high standard.




December 2014                                                                             Cardno HRP                                                                                        A104
Log in to download the original file

MCU14_0106 & OPW15_0001 Town Planning Report & Appendix A Code Compliance.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.