MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance
Original PDF page 188, section 1. The text section number identifies this passage in the reader.
Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
Specific Outcome Probable Solution Response
O10 Sewerage reticulation infrastructure is No solution provided. R10 Alternative Solution (as no Probable Solution is provided)
proven to be suitable for its use prior to An appropriate maintenance period can be conditioned as required.
Council accepting the dedicated asset.
O11 Sewerage reticulation infrastructure is No solution provided. R11 Alternative Solution (as no Probable Solution is provided)
provided with all supporting technical Technical documentation associated with any relevant infrastructure
documentation. (e.g. pumps, valves and fittings) will be provided
O12 Where buildings or other structures are S12.1 The footing of any structure or building is located clear of the R12 Alternative Solution
developed adjacent to Council’s sewerage zone of influence but no closer than 1.5m (measured Design to be undertaken to ensure the requirements of O12 are met.
reticulation infrastructure, satisfactory horizontally) from infrastructure including sewers, water mains
provision is made to protect the and stormwater structures; Refer to Appendix E – Engineering Report.
infrastructure from physical damage and to AND
allow ongoing maintenance by Council.
S12.2 A registered easement in favour of Council is created over all
underground infrastructure located in private property;
AND
S12.3 The width of the easement is the greater of 3m or the width of
the zone of influence;
AND
S12.4 The easement is centred over the centreline of the
infrastructure.
O13 Alignment of sewerage reticulation S13.1 Infrastructure is constructed on the preferred alignments in R13 Alternative Solution
infrastructure is to allow for easy access for accordance with PSP6 –Engineering Design Standards — Detailed design to be undertaken to ensure the requirements of O13
the ongoing maintenance by Council. Water and Sewerage. are met.
Refer to Appendix E – Engineering Report.
O14 Any alterations or repairs to infrastructure S14.1 Any alterations or repair to infrastructure as a result of the R14.1 Can Comply
as a result of the development are made at development are completed at the developer’s expense. This matter can be conditioned if required.
no cost to Council.
December 2014 Cardno HRP A107
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.