MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance

of 239

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 188, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                  Town Planning Report
                                                                                                   28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive



 Specific Outcome                                         Probable Solution                                                          Response
 O10    Sewerage reticulation infrastructure is                   No solution provided.                                              R10 Alternative Solution (as no Probable Solution is provided)
        proven to be suitable for its use prior to                                                                                   An appropriate maintenance period can be conditioned as required.
        Council accepting the dedicated asset.
 O11    Sewerage reticulation infrastructure is                   No solution provided.                                              R11 Alternative Solution (as no Probable Solution is provided)
        provided with all supporting technical                                                                                       Technical documentation associated with any relevant infrastructure
        documentation.                                                                                                               (e.g. pumps, valves and fittings) will be provided
 O12    Where buildings or other structures are          S12.1    The footing of any structure or building is located clear of the   R12 Alternative Solution
        developed adjacent to Council’s sewerage                  zone of influence but no closer than 1.5m (measured                Design to be undertaken to ensure the requirements of O12 are met.
        reticulation infrastructure, satisfactory                 horizontally) from infrastructure including sewers, water mains
        provision is made to protect the                          and stormwater structures;                                         Refer to Appendix E – Engineering Report.
        infrastructure from physical damage and to                AND
        allow ongoing maintenance by Council.
                                                         S12.2    A registered easement in favour of Council is created over all
                                                                  underground infrastructure located in private property;
                                                                  AND
                                                         S12.3    The width of the easement is the greater of 3m or the width of
                                                                  the zone of influence;
                                                                  AND
                                                         S12.4    The easement is centred over the centreline of the
                                                                  infrastructure.
 O13    Alignment of sewerage reticulation               S13.1    Infrastructure is constructed on the preferred alignments in       R13 Alternative Solution
        infrastructure is to allow for easy access for            accordance with PSP6 –Engineering Design Standards —               Detailed design to be undertaken to ensure the requirements of O13
        the ongoing maintenance by Council.                       Water and Sewerage.                                                are met.
                                                                                                                                     Refer to Appendix E – Engineering Report.
 O14    Any alterations or repairs to infrastructure     S14.1    Any alterations or repair to infrastructure as a result of the     R14.1 Can Comply
        as a result of the development are made at                development are completed at the developer’s expense.              This matter can be conditioned if required.
        no cost to Council.




December 2014                                                                             Cardno HRP                                                                                         A107
Log in to download the original file

MCU14_0106 & OPW15_0001 Town Planning Report & Appendix A Code Compliance.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.