Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
Performance Outcomes Acceptable Outcomes Response
Editor’s note: A Registered Professional Engineer of Queensland (RPEQ)
certified barrier design complies with this acceptable outcome.
PO3 Buildings and structures in, over or below a AO3.1 Buildings and structures, including piers or supporting elements, R3 Not Applicable
railway or future railway land are able to sustain located in, over or below a railway or future railway land are designed and The proposed development is not located within the vicinity of a
impacts to their structural integrity in the event of an constructed in accordance with AS5100 Bridge design, AS 1170 Structural railway or future railway land.
impact from a derailed train. design actions and Civil Engineering Technical Requirement CIVIL-SR-012
Collision protection of supporting elements adjacent to railways,
Queensland Rail, 2011.
Editor’s note: Part A.9 – Collision protection of the Guide for development
in a railway environment, Department of Infrastructure and Planning, 2010,
provides guidance on how to comply with this acceptable outcome.
PO4 Buildings and structures in, over, below or within AO4.1 Development in, over, below or within 50 metres of a state- R4 Not Applicable
50 metres of a state-controlled transport tunnel or a controlled transport tunnel or future state-controlled transport tunnel The proposed development is not located within the vicinity of a
future state-controlled transport tunnel have no ensures that the tunnel is: state-controlled transport tunnel or a future state-controlled transport
adverse impact on the structural integrity of the state- (1) not vertically overloaded or affected by the addition or removal of tunnel.
controlled transport tunnel. lateral pressures
(2) not adversely affected as a result of directly or indirectly disturbing
groundwater or soil.
Editor’s note: To demonstrate compliance with this acceptable outcome, it
is recommended that a Registered Professional Engineer of Queensland
(RPEQ) certified geotechnical assessment, groundwater assessment and
structural engineering assessment be prepared and submitted with the
application.
PO5 Development involving dangerous goods AO5.1 Development involving dangerous goods, other than hazardous R5 Not Applicable
adjacent to a railway or future railway land does not chemicals below the threshold quantities listed in table 5.2 of the State The proposed development is not located within the vicinity of a
adversely impact on the safety of a railway. Planning Policy guideline: State interest – emissions and hazardous railway or future railway land.
activities, Guidance on development involving hazardous chemicals,
Department of State Development, Infrastructure and Planning, 2013,
ensures that impacts on a railway from a fire, explosion, spill, gas emission
or dangerous goods incident can be appropriately mitigated.
Editor’s note: To demonstrate compliance with this acceptable outcome, it
is recommended that a risk assessment be undertaken in accordance with
Attachment 1: Risk assessment guide of the Guide for development in a
railway environment, Department of Infrastructure and Planning, 2010.
PO6 Any part of the development located within 25 AO6.1 Advertising devices proposed to be located within 25 metres of a R6 Not Applicable
metres of a state-controlled road or future state- state-controlled road or future state-controlled road are designed to meet The proposed development is not located within the vicinity of a state
controlled road minimises the potential to distract the relevant standards for advertising outside the boundaries of, but visible controlled road or future state controlled road.
drivers and cause a safety hazard. from, a state-controlled road, outlined within the Roadside advertising
guide, Department of Transport and Main Roads, 2013.
PO7 Filling, excavation and construction does not AO7.1 Filling and excavation does not undermine, cause subsidence of, or R7.1 Complies
adversely impact on or compromise the safety or groundwater seepage onto a state transport corridor or future state
operation of: transport corridor.
December 2014 Cardno HRP A124
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.