PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 08 AUGUST 2017
c. The terms of the easement must allow for the use of the easement by the public
whether in vehicles, cycles or on foot.
34. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
35. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
36. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
37. All earthworks, associated batters and retaining walls must be undertaken in
accordance with an Operational Works approval, and must in particular:
a. Be undertaken in compliance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
b. Be carried out in accordance with a site-specific Geotechnical Investigation
Report prepared by a suitably qualified person* that addresses, in particular:
i. the impact of excavation and the construction works on the stability of
nearby building and infrastructures
ii. Acid Sulfate Soil assessment report in accordance with State Planning
Policy 2/02 Planning and Managing Development Involving Acid Sulfate
Soils and supported by appropriate testing and documentation.
c. Have all access chamber surface levels for drainage, water supply or sewerage
infrastructure within the work site be adjusted to provide a freeboard of 100mm
above the finished ground surface level or be in accordance with the
requirements and directions of the service provider.
d. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
(*) refer to Advisory Notes
Acid Sulfate Soils
38. Where excavations of non-imported soils below the elevation of 5m AHD are necessary
for construction, the application for Operational Works for Bulk Earthworks, Stormwater
and /or Landscaping must demonstrate and include certification from a suitably
experienced and qualified geotechnical engineer of methods necessary to ensure
construction and operation of the development:
a. Shall be consistent with Queensland Acid Sulphate Soil Technical Manual: Soil
Management Guidelines; and
b. will not result in the release of acid or associated metals; and
c. will not cause localised lowering of groundwater.
Erosion and Sediment Control
39. Prior to the completion of the development, all site surfaces must be effectively
stabilised. For the purpose of this condition, an effectively stabilised surface is defined
as one that does not, or is not likely to result in visible evidence of soil loss caused by
sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Page 43 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.