Performance outcomes Acceptable outcomes
PO48 AO48
Development and associated site works including filling, Development and associated site works, including filling and
excavation and retaining structures do not directly, indirectly excavation, are designed and constructed to ensure overland
or cumulatively cause adverse impacts external to the flow and/or flooding is not worsened, impeded, or otherwise
development site by: diverted to adversely affect other properties.
(a) causing ponding of water on the site or nearby land;
(b) increasing flooding, which adversely affects the safety
or use of any land upstream and downstream; or
adversely affecting the flow of water in any overland flow
path.
Table 6.8.1.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Environment, heritage and scenic amenity
PO49 AO49.1
Development: Development does not result in sediment or other material
(a) retains natural vegetation wherever possible; including building materials or waste products being deposited
or released into the road reserve, stormwater drain or adjacent
(b) has minimal impact on the natural landform of the site;
properties.
(c) does not lead to erosion or the transport of sediments
off site; AO49.2
(d) does not lead to the disturbance of natural features, Where there is a nominated building envelope on the lot,
buildings or structures of cultural heritage significance. clearing of native vegetation and building works does not
extend beyond the building envelope, except for the purposes
of a driveway access.
AO49.3
Development on a site adjoining a heritage site respects the
cultural heritage significance of the site by mitigating any
adverse impacts on the setting or integrity of the heritage.
Editor’s Note— Heritage sites are identified on the Heritage
and Character Areas overlay maps in schedule 2.
Table 6.8.1.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Infrastructure
PO50
Development is supported by adequate infrastructure and No acceptable outcome provided
services including reticulated water, sewerage, stormwater
drainage, sealed roads, pathways, electricity and
telecommunication infrastructure.
PO51
Development does not adversely impact on the continued No acceptable outcome provided
operation, viability and maintenance of existing infrastructure
or compromise the future provision of planned infrastructure.
Development at the Noosa Business Centre
Page 459 of 1290
Page 14 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (62f8d7f274.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.