Decision Notice - Council Meeting Decision MCU23 0096 [As Published] · MCU23/0096
Car Parking
17. A minimum of 298 car parking spaces must be provided on site and made available and
accessible at all times. Car Park P2 is to provide 81 short-term parking spaces, with 16
spaces being available for drop-off and pick-up with queuing for a minimum of 8 spaces.
Vehicle manoeuvring areas are provided on site in accordance with the Australian
Standards for Off-street car parking so vehicles enter and leave the site in a forward
gear.
18. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
19. Directional signage must be provided to direct visitors to the car parking spaces provided
on site.
Stormwater Drainage
20. The development area must be connected to the existing on site stormwater system and
constructed in accordance with the submitted Stormwater Management Plan prepared
by Colliers - reference 21-0211SMP01V1 dated 27 February 2023. The works must be
undertaken in accordance with an Operational Works approval.
Construction Management
21. The demolition and construction activities must not adversely impact on the local road
network. Any changes to the existing local traffic management must be approved by
Council prior to the installation of any changes.
22. A preliminary Construction Management Plan must be submitted to and approved by
Council prior to the issue of any Building or Operational Works approval. The plan must
address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
iv. provision for worker car parking on site
v. materials delivery
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, emergency
services and local businesses to advise of agreed construction times, impacts on
traffic, services and other relevant issues.
e. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details.
f. Include signage in prominent locations on the boundaries of the site advising of
the proposed development, the expected time frames and the site contact details.
Page 4 of 10
Document Set ID: 23317001
Version: 5, Version Date: 24/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision MCU23 0096 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 264 KB (small file)
- File type
No other editions are linked here.