Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
necessary by the Superintendent, sand traps on the discharge line of any pump to prevent the deposit of material in channels and stormwater drains. Where water is diverted from the Site it shall be confined to existing drainage paths and away from adjacent private property. 1.9 Setting-Out Construction works set-out including road centreline pegging will be provided by the Contractor. The Contractor is responsible for his own set-out using the plan coordinates and set-out details and the Principal's survey information provided. The Contractor is responsible for maintaining all survey controls during the course of the Contract. The cost of maintenance and reinstatement is the Contractor's responsibility. Survey information showing property and construction levels, dimensions and datum for levels is shown on the drawings. All work shall be set out by the Contractor in accordance with the information supplied. The Contractor shail accept full responsibility for all setting-out and levelling and shall be responsible for making good and bringing to required line and/or level any works which are wrongly built whether due to error in transference of levels or dimension or to any other cause during setting-out. The Contractor shall offset all essential engineering pegs during the works to enable the Superintendent to carry out checks on line and level and to enable works to proceed in accordance with the program. 1.10 Public Utilities - Regulations, Notices and Fees The Contractor shall carry out all work under this Contract in accordance with the provisions of this Specification, and in addition shall comply with the latest requirements of the following and pay all necessary fees: » Local Council » Australian Standard AS 3000 — (SAA Wiring Rules) » Division of Occupational Safety and Weights and Measures » The Building Act » Inspection of Machinery Act » Workplace Health and Safety Act » Energex » Any other Authority having jurisdiction over the work Where overhead public utility lines and surface drainage works and/or underground pipes, conduits, or cables exist in the vicinity of the works, the Contractor shall take care to protect such facilities from damage and, in the case of any damage occurring to such facilities, the matter shall be immediately reported to the department or company concerned and to the Superintendent. The cost of the necessary 41/22382/11840 Girraween Sports Precinct 9 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.