Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
= and/or the obtaining of samples by a testing Authority nominated by the Superintendent. In the event that the tests indicate compliance with the requirements of the Contract, payment will be made for testing on a prime cost basis. The Contractor shall be responsible for the costs of all testing which demonstrates that the works do not comply with the requirements of the Contract. If the Contractor fails to perform any of the foregoing obligations with regard to testing, the Principal shall be at liberty to perform/undertake any testing or inspection at the Contractor's works or elsewhere, and all costs and expenses incurred in the matter shall be payable by the Contractor to the Principal on demand, or may be deducted and retained by the Principal from monies due or that may become due to the Contractor under the Contract. 1.6 Traffic The Contractor shall provide for continuous operation of normal traffic along all roads and pedestrian and vehicular access to properties included in the Contract or intersected by works under the Contract. The Contractor shall be responsible for any necessary approvals for the transport of any earthworks and road building materials. The Contractor shail be held entirely responsible for the safety of all pedestrian and vehicular traffic and shall provide all necessary watchmen, lights, barriers, notices and signs and shall provide and maintain the same to the satisfaction of the Superintendent and/or the Local Authority. Signs shall conform to the current DTMR Manual of Uniform Traffic Control Devices (Qld). The Contractor shall not unnecessarily in its operations obstruct any side road, branch track, drain or watercourse and shall not break down any fences or gates without prior notification to the Superintendent, but when such obstructions or breakages cannot be avoided, shall remove such obstruction or repair such breakage as soon as possible. In the event of the Contractor failing to comply with its responsibilities under this Clause the Principal shall have the power, without further notice, to take such steps as the Superintendent considers necessary to provide for the passage and safety of traffic or to remove any obstruction or to repair any damage including, if it considers it necessary, the employment of workmen and watchmen and the cost thereof will be deducted from any monies due to the Contractor under this Contract. Notwithstanding any action the Superintendent may take in this regard, the Contractor shall be liable for damages arising out of any accident in connection with the carrying out of the Contract. 1.7 Excavation The Contract Sum shall include excavation in all materials. No extra payment shall be made for excavation irrespective of the materials or conditions encountered. 1.8 Diverting Water The Contractor shall do all work necessary to divert any water interfering with the progress of the works, keep the excavations free from water while the works are in progress, and prevent any injury to the works by water due to floods or other causes. The Contractor shall provide, where considered 41/22382/11840 Girraween Sports Precinct 8 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.