Council archive · source document
06/1168 - Change a Development Approval [As Published] · 132006.1168.02
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
or The ‘on-maintenance' inspection shall be attended by at least the following personnel: » Superintendent; » Contractor; » Council's Subdivision Engineer/Inspector. Acceptance by Council does not constitute practical completion or acceptance ‘on-maintenance’ by the Principal. The general requirements to be met prior to Council's acceptance of the works ‘on-maintenance’ are as follows: » the site is clean, tidy, free of rubbish, rocks, sticks, unauthorised stockpiles, etc.; » earthworks and site grading to be free draining and in accordance with the approved design; » sediment and erosion control works in place to the satisfaction of Council; » maintenance security deposit lodged; » ‘As Constructed’ submission lodged for approval seven (7) days prior to ‘on-maintenance’ meeting. 2.8 Off-Maintenance Inspection At the end of 12 months from the ‘on-maintenance’ approval date, an ’off-maintenance’ inspection is to be arranged with Council. The ’off-maintenance’ inspection is to be attended by: » Council's Subdivision Engineer/inspector » The Superintendent; » The Contractor. During the 12 month maintenance period, it is the responsibility of the Contractor to rectify any works found to be defective or found to exhibit faults attributed to the performance of the construction activities in terms of quality and conformance with the design and specifications. At completion of the maintenance period and prior to the Council inspection the Contractor shall arrange for all roads to be cleaned, gutters swept, footpaths reinstated and all drainage systems to be flushed and cleaned and costs shall be included in the Tender Lump Sum. All costs during the maintenance period for defects rectifications as well as attendance at the ‘off- maintenance’ inspection are to be allowed for by the Contractor in his tender prices. 41/22382/11840 Girraween Sports Precinct 14 Earthworks Package
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1168 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.