GENERAL COMMITTEE MEETING AGENDA 12 SEPTEMBER 2022
Currency Period
10. This development approval lapses if the use has not happened by 15 September
2028 unless an application to extend the currency period is approved by Council.
Building Height
11. The maximum height of the development must not exceed RL118.15 to the peak
of the roof line as detailed on section B-B of Plan SK04.
12. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the building does not exceed the maximum height requirement of
this Decision Notice.
Performance Bond
13. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to the issue of a Development Permit for Operational Works.
The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Street Identification
14. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
External Works – Wimmers Lane
15. Wimmers Lane must be upgraded for the length of its frontage to the subject site.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. construction of kerb and channelling, road widening and underground
stormwater drainage to the development side only. The final extent and
alignment of works to be determined as part of the subsequent
Operational Works approval.
Road Widening of Wimmers Lane
16. The developer must dedicate as “road” a 2m wide strip extending across the full
frontage of the site to Wimmers Lane. The dedication must be in accordance with
drawing number Plan number SK01 Version G dated 23 August 2022 prepared
by Wiltshire Stevens Architecture.
17. The dedication must be completed prior to the commencement of the use.
External Works – Emerald Street
18. Emerald Street must be upgraded for the length of its frontage to the subject site.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. a full width pathway extending from the property boundary to the kerb and
channel.
b. works to transition the new full width pathway to match smoothly with the
existing frontages of the adjoining properties. These works will extend
beyond the frontage of the subject site. The transitions must be constructed
at grades that are in accordance with Council’s Planning Scheme Policy 5
– Engineering Design Standards – Roads, Drainage and Earthworks.
c. any necessary relocation or alteration to existing access from Emerald
Page 6 of 85
See the original
The page text is free to read. Viewing or downloading an original file needs an account.