Original source · versioned page text
2022-09-12 General Committee Meeting Agenda
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 SEPTEMBER 2022
Street to the adjoining property at 4 Emerald Street must be undertaken.
The type and extent of these works must be in agreement with the adjoining
property owner and clearly shown on plans submitted for operational
works.
d. Any relocation/reinstatement of existing services in the road verge.
These works are to be undertaken at no cost to Council.
Site Access and Driveways
19. A sealed access driveway must be provided from Wimmers Lane to all parking
and manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. a driveway crossover generally in accordance with RS-051 and any
associated addendum.
Car Parking
20. A minimum of 23 car parking spaces and 2 motor cycle spaces must be provided
and marked on the site for the commercial development, and made available and
accessible at all times while the use is open for business. The works must be
undertaken in accordance with an Operational Works approval and must include
in particular:
a. pedestrian routes in accordance with the conditions of this Decision Notice
.
b. 1 disabled parking space within the total.
c. dimensions, crossfalls and gradients in accordance with Australian
Standard AS2890: Parking Facilities.
21. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Pedestrian and Bicycle Facilities
22. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. a 2 metre wide footpath along one side of Wimmers Lane and Emerald
Street.
b. the resealing of the existing asphalt path fronting the development.
23. Pedestrian and bicycle facilities must be provided for the development and
include:
a. 10 bicycle parking spaces and 5 lockers; and
b. one shower cubicle with ancillary change room.
Stormwater Drainage
24. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
a. works generally in accordance with the Stormwater Layout Plan. Fig 1.2
Revision B prepared by Callaghan & Toth dated 6 July 2022;
b. extension of the site stormwater system to accommodate stormwater from
the existing external drainage pipe from Lot 2 on RP44101 to the east; and
Page 7 of 85
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.