NOOSA COUNCIL IDAS Development Application Decision Notice 7
43.5. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers,
the use of vibrating installation techniques for sheet piling and other construction vibrations caused
by excavating, earthmoving or demolition machinery or other similar construction techniques;
43.6. The construction management plan is to be adhered to;
43.7. Copies of all inspection reports by engineers are to be submitted to Council within 5 business days
of the inspection taking place;
43.8. The applicant’s Geotechnical engineer will be required to be on site for the whole of the time during
any excavation. The construction of the whole of the foundations and retaining walls is to be
supervised and directed on site by a consulting Geotechnical engineer. No work of any such kind
relating to the foundations shall be carried out if he is not on the site and supervising and directing
this work. Such works shall only be carried out during dry weather conditions and if there is a risk
of sand movement occurring, all work shall be suspended until such steps, approved by the
applicant’s Geotechnical engineer and the Council’s Building Surveyor, have been taken to ensure
that no further slippage will result.
43.9. Survey marks should be established on the structure to monitor the construction and surrounds for
movement. Monitoring for any potential movement shall be carried out at regular intervals of a
maximum length time of three (3) months for at least the first year from the use commencing. The
monitoring results shall be assessed by a geotechnical engineer and may be scaled down or
stoped depending on the results and subject to the geotechnical engineer recommendations.
Additional Condition 29/03/07
44. The sewer connection shall be undertaken in accordance with an approved Arborist’s report and the
following requirements:
44.1. The route for the service trench shall be a minimum of 1.5 metres clear of all trees and shrubs,
unless otherwise agreed to by the Manager, Land Use.
44.2. An arborist shall be on site all times supervising the works being undertaken.
44.3. Prior to commencing any works, the route for the service trench shall be pegged and inspected by
Manager, Land Use.
44.4. Prior to excavation existing mulch/leaf cover material over proposed trench shall be raked back
and stockpiled for covering of trench area after completion.
44.5. Works shall be undertaken in a progressive manner and route reinstated as works progress.
44.6. Uphill anchor roots of trees shall not be disturbed.
44.7. All works shall be carried out by hand excavation other then the sewer trench under existing road
pavement.
44.8. All excavated material shall be placed on a ‘tarpaulin’ or the like laid immediately adjacent to the
proposed trench.
44.9. Excavated material shall be used as bedding and backfilling of trench.
44.10. Where works disturb the understorey vegetation, rehabilitation works shall be undertaken to the
reasonable satisfaction of Manager, Land Use.
SEP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 50 KB (small file)
- File type
No other editions are linked here.